Training course
Overview
Quantity Surveying
Fundamentals for Managers is a comprehensive professional training course
designed to equip managers with the knowledge required to understand, oversee,
and make informed decisions about construction cost, commercial, procurement,
and quantity surveying activities. The course provides a management-oriented
understanding of quantity surveying across the construction project lifecycle,
covering cost planning, estimating, measurement, bills of quantities,
procurement, tendering, contract administration, valuations, variations,
claims, forecasting, and final accounts. It focuses on the managerial
interpretation and application of quantity surveying information rather than
purely technical measurement activities.
This quantity surveying management
training course develops the ability to evaluate project budgets, understand
cost drivers, challenge estimates, interpret cost reports, assess procurement
strategies, review tender submissions, and monitor commercial performance.
Participants examine recognized measurement principles, standard methods of
measurement, FIDIC contract concepts, cost-control frameworks, professional
ethics, commercial risk management, and construction project governance.
Particular attention is given to how managers can use quantity surveying
information to support scope decisions, resource allocation, cost certainty,
risk management, procurement decisions, and effective project governance.
The program incorporates practical
management tools including cost plans, elemental cost analyses, budget
dashboards, tender comparison statements, procurement matrices, commercial risk
registers, cost-value reconciliation, cash-flow forecasts, variation registers,
claims trackers, subcontractor performance reports, and management-level cost
reports. Participants work through realistic construction scenarios involving
budget overruns, design changes, tender anomalies, delayed information,
procurement risks, variations, payment issues, supply-chain disruption, and
commercial disputes. Excel-based cost-control techniques, digital quantity
surveying, BIM and 5D cost-management concepts, and data-driven reporting are
integrated to strengthen managerial oversight and decision-making.
By completing Quantity
Surveying Fundamentals for Managers, participants will be better
prepared to lead and supervise quantity surveying and commercial functions,
communicate effectively with quantity surveyors and contractors, and use cost
information to improve construction project performance. The course progresses
from fundamental quantity surveying concepts to advanced managerial
applications in cost forecasting, commercial risk, value engineering, lifecycle
economics, digital construction, claims management, and final-account control.
A comprehensive capstone enables managers to integrate technical understanding,
commercial analysis, governance, and strategic decision-making within a
realistic construction project environment.
Course
Duration
10 Days (80 Hours)
Target
Participants
·
Construction Managers and Project Managers
·
Quantity Surveying Managers and Commercial
Managers
·
Engineering and Technical Managers
·
Procurement and Contracts Managers
·
Property and Facilities Managers involved in
capital projects
·
Project Controls and Cost-Control Managers
·
Senior Quantity Surveyors progressing into
management roles
·
Construction company managers and contractor
representatives
·
Consultants responsible for project cost and
commercial oversight
·
Infrastructure and capital-project managers
·
Professionals responsible for budgets,
procurement, contracts, project performance, and commercial governance
·
Managers seeking practical knowledge of quantity
surveying and construction cost management
Course
Objectives
By the end of the training,
participants will be able to:
·
Explain the role of quantity surveying and its
contribution to construction project management and governance
·
Understand the quantity surveyor's
responsibilities across feasibility, design, procurement, construction,
completion, and final-account stages
·
Interpret quantity surveying information,
construction drawings, specifications, BOQs, cost plans, valuations, and
commercial reports
·
Understand recognized measurement principles and
standard methods of measurement used in construction
·
Evaluate construction estimates, unit rates,
budgets, preliminaries, overheads, risk allowances, and project cost drivers
·
Review and challenge cost plans, forecasts,
benchmarks, and value-engineering proposals
·
Develop appropriate procurement and tender
strategies based on project objectives, scope, risk, programme, and market
conditions
·
Evaluate tender submissions, commercial
qualifications, abnormal pricing, exclusions, and contractor commercial risks
·
Understand key construction contract principles
and FIDIC-based contract administration requirements
·
Monitor interim valuations, payment
applications, retention, advances, securities, and other commercial obligations
·
Establish effective management controls for
variations, provisional sums, prime cost items, dayworks, and changes
·
Analyze project cost reports, commitments,
actual costs, forecasts, cash flow, and cost-value reconciliation
·
Assess commercial risks associated with delays,
disruption, inflation, procurement, supply chains, and contractual changes
·
Understand the commercial implications of
claims, extensions of time, acceleration, disruption, and disputes
·
Use Excel, digital quantity surveying systems,
BIM, 5D cost-management concepts, and dashboards to support managerial
decisions
·
Apply value management, lifecycle costing,
sustainability costing, and total-cost-of-ownership principles
·
Monitor subcontractor commercial performance and
manage key commercial interfaces
·
Establish effective commercial governance,
reporting, escalation, and decision-making processes
·
Evaluate final accounts, commercial closeout,
lessons learned, and project cost performance
·
Lead an integrated quantity surveying and
commercial management process through a realistic construction project scenario
Course
Content
Day
1: Quantity Surveying Foundations, Management Awareness, and Construction
Economics
Module 1: Quantity Surveying Foundations,
Management Awareness, and Construction Economics
1. Quantity
Surveying and the Manager's Role — understand the purpose, scope,
responsibilities, and organizational value of quantity surveying and how
managers interact with QS and commercial teams.
2. Quantity
Surveying Across the Project Lifecycle — examine feasibility, concept design,
detailed design, procurement, tendering, construction, completion, defects
liability, and final-account stages.
3. Construction
Project Team and Commercial Interfaces — clarify the responsibilities of
clients, project managers, quantity surveyors, architects, engineers,
contractors, subcontractors, procurement teams, and finance functions.
4. Construction
Economics and Cost Drivers — analyze labour, materials, plant, productivity,
preliminaries, overheads, inflation, logistics, programme, market conditions,
and project complexity.
5. Understanding
Construction Cost Structures — distinguish direct costs, indirect costs,
preliminaries, overheads, profit, contingencies, risk allowances, provisional
sums, and other commercial components.
6. Scope,
Requirements, Budget, and Cost Objectives — understand how managers translate
project requirements into scope, deliverables, budgets, assumptions,
exclusions, and cost targets.
7. Professional
Ethics and Commercial Governance — examine professional conduct,
confidentiality, transparency, conflicts of interest, accountability,
commercial integrity, and responsible decision-making.
8. Construction
Information and Document Control — understand drawings, specifications,
schedules, revisions, RFIs, instructions, addenda, contracts, and
information-management requirements.
9. Standards,
Frameworks, and Professional Practice — introduce recognized measurement
standards, professional guidance, FIDIC concepts, ISO management principles,
and project-specific commercial procedures.
10. Case Study
and Exercise: Managerial Quantity Surveying Diagnostic — assess a simulated
construction project, identify cost drivers and commercial risks, map QS
responsibilities, and develop a management-level cost-control priority plan.
Day
2: Measurement, Drawings, Bills of Quantities, and Cost Information
Module 2: Measurement, Drawings, Bills of
Quantities, and Cost Information
1. Construction
Drawing Interpretation for Managers — develop the ability to review
architectural, structural, civil, and MEP drawings and understand their
commercial implications.
2. Understanding
Specifications and Scope — examine technical specifications, schedules,
performance requirements, inclusions, exclusions, and scope interfaces
affecting cost.
3. Measurement
Principles and Standard Methods — understand measurement units, descriptions,
rules, dimensions, deductions, and recognized standard methods of measurement.
4. Quantity
Take-Off and Measurement Workflow — examine how quantities are extracted,
checked, documented, abstracted, and converted into commercial information.
5. Bills
of Quantities Structure — understand preliminaries, preambles, measured works,
provisional sums, prime cost items, dayworks, and other BOQ components.
6. BOQ
Review and Commercial Quality Assurance — identify omissions, duplication,
inconsistent descriptions, unrealistic quantities, scope gaps, and measurement
risks.
7. Major
Construction Quantity Categories — review quantities for earthworks,
foundations, concrete, reinforcement, structural elements, masonry, finishes,
roofing, external works, and building services.
8. Measurement
Interfaces Between Disciplines — understand how architectural, structural,
civil, and MEP scope interfaces can create quantity gaps, overlaps, and
commercial exposure.
9. Practical
Digital Measurement and BIM Concepts — examine electronic take-off, model-based
measurement, information maturity, quantity validation, and limitations of
digital quantity extraction.
10. Exercise:
Managerial BOQ Review — review a simulated BOQ and drawing package, identify
commercial inconsistencies and scope risks, and prepare a management review
report.
Day
3: Estimating, Rate Analysis, Budgeting, and Cost Planning
Module 3: Estimating, Rate Analysis,
Budgeting, and Cost Planning
1. Construction
Estimating Fundamentals — understand preliminary estimates, order-of-cost
estimates, elemental estimates, detailed estimates, and resource-based
estimating.
2. Reviewing
Construction Unit Rates — examine labour, materials, plant, productivity,
wastage, transport, overheads, risk, and profit components of construction
rates.
3. Construction
Productivity and Cost Drivers — evaluate labour productivity, crew composition,
equipment utilization, material consumption, site constraints, and construction
methods.
4. Preliminaries
and Project Overheads — understand site establishment, supervision, temporary
facilities, utilities, security, logistics, insurance, testing, and management
costs.
5. Budget
Development and Cost Targets — establish project budgets, cost limits,
allowances, contingencies, and management reserves appropriate to project
maturity and risk.
6. Cost
Planning and Elemental Analysis — review elemental cost plans, cost checks,
design development impacts, cost targets, and budget variance.
7. Benchmarking
and Historical Cost Data — use historical project information, normalized
costs, market data, cost indices, and benchmarks to assess estimate reasonableness.
8. Cost
Forecasting and Management Reserves — distinguish approved budgets, forecast
costs, contingency, risk allowances, and potential final-cost exposure.
9. Case
Study: Construction Budget Challenge — analyze a project facing rising material
prices and design changes, identify cost pressures, and evaluate alternative
management responses.
10. Exercise:
Management Cost-Plan Review — review a project estimate and cost plan,
challenge key assumptions, identify major cost drivers, and prepare a
management cost-control action plan.
Day
4: Value Management, Procurement Strategy, and Tender Management
Module 4: Value Management, Procurement
Strategy, and Tender Management
1. Cost
Planning Through Design Development — understand how managers use cost plans
and design-stage cost checks to maintain budget alignment.
2. Value
Engineering and Value Management — evaluate functional requirements,
alternative materials, construction methods, specifications, and design
solutions to improve value.
3. Lifecycle
Cost and Total Cost of Ownership — compare capital cost with operating,
maintenance, replacement, energy, and disposal costs.
4. Procurement
Methods and Delivery Strategies — examine traditional procurement,
design-and-build, EPC, management contracting, construction management, frameworks,
and collaborative approaches.
5. Procurement
Strategy and Risk Allocation — evaluate scope maturity, programme, market
conditions, design responsibility, price certainty, and commercial risk
allocation.
6. Tender
Packaging and Commercial Scope — understand package strategy, work interfaces,
responsibilities, deliverables, and procurement boundaries.
7. Tender
Documentation and Pricing Requirements — review BOQs, schedules of works,
preliminaries, specifications, instructions to tenderers, and commercial return
requirements.
8. Tender
Queries, Clarifications, and Addenda — establish managerial controls for bidder
questions, commercial clarifications, revised information, and tender
communications.
9. Case
Study: Procurement and Value Optimization — evaluate procurement options and
value-engineering proposals for a complex project while considering cost, time,
quality, and risk.
10. Exercise:
Procurement Strategy Workshop — develop a procurement strategy and
tender-management plan for a simulated construction project, including package
structure, risk allocation, and commercial controls.
Day
5: Tender Evaluation, Contracts, and Commercial Risk
Module 5: Tender Evaluation, Contracts,
and Commercial Risk
1. Tender
Compliance and Commercial Review — understand how tender submissions are
checked for completeness, qualifications, exclusions, securities, pricing
schedules, and contractual compliance.
2. Tender
Comparison and Normalization — compare bids by adjusting for qualifications,
assumptions, exclusions, provisional items, discounts, and other commercial
differences.
3. Tender
Rate Analysis — review labour, material, plant, preliminaries, overheads,
profit, and other components to understand bidder pricing.
4. Abnormal
and Unbalanced Tender Pricing — identify front-loading, back-loading, unusually
high or low rates, distorted quantities, and potential commercial exposure.
5. Contractor
Commercial and Financial Assessment — review contractor experience, financial
capacity, resources, bonding, insurance, subcontracting arrangements, and
commercial capability.
6. Tender
Clarification and Negotiation — establish structured processes for commercial
clarification, negotiation, revised pricing, and management approval.
7. Contract
Formation and Pre-Award Controls — confirm scope, contract sum, programme,
payment mechanisms, securities, insurance, variations, and other commercial
requirements.
8. FIDIC
and Construction Contract Concepts — examine key principles relating to
contract documents, instructions, payment, variations, claims, notices,
extensions of time, and records.
9. Commercial
Risk Management — establish risk registers covering procurement, pricing,
design, programme, supply chain, payment, contractual, and market risks.
10. Case Study:
Tender Evaluation and Contract Award — assess competing tender submissions,
identify commercial risks and abnormal pricing, and prepare a management-level
tender recommendation.
Day
6: Contract Administration, Valuations, Payments, and Cost Governance
Module 6: Contract Administration,
Valuations, Payments, and Cost Governance
1. Post-Contract
Commercial Management — understand the manager's role in controlling contract
value, commitments, costs, variations, forecasts, and commercial performance.
2. Contract
Administration Responsibilities — establish controls for contract documents,
instructions, notices, correspondence, approvals, records, and commercial
decisions.
3. Interim
Valuations and Payment Applications — understand how completed work, approved
variations, materials on site, retention, deductions, and other payment
components are assessed.
4. Valuation
Evidence and Progress Measurement — evaluate supporting records such as site
measurements, photographs, inspection records, progress reports, and approved
documentation.
5. Materials
on Site and Stored Materials — assess commercial eligibility, ownership,
inspection, storage, insurance, traceability, and valuation requirements.
6. Retention,
Advance Payments, Bonds, and Guarantees — monitor contractual deductions,
recovery mechanisms, securities, retention balances, and release conditions.
7. Cost
Coding and Commitment Management — establish cost structures linking contracts,
purchase orders, subcontracts, commitments, actual costs, variations, and
forecasts.
8. Cost-Value
Reconciliation — compare budget, committed cost, actual cost, certified value,
forecast cost, and potential final cost.
9. Management
Cost Reporting — interpret cost reports, variance analysis, cash-flow
forecasts, cost-to-complete assessments, and estimate-at-completion
information.
10. Exercise:
Commercial Performance Review — review a simulated valuation and cost report,
identify financial and contractual issues, assess forecast exposure, and
prepare management actions.
Day
7: Variations, Claims, Delays, Subcontractors, and Commercial Risk
Module 7: Variations, Claims, Delays,
Subcontractors, and Commercial Risk
1. Change-Control
Governance — establish management procedures for identifying, reviewing,
approving, documenting, pricing, and tracking project changes.
2. Variation
Assessment — understand contract rates, derived rates, new rates, quotations,
dayworks, resource-based analysis, and valuation principles.
3. Provisional
Sums and Prime Cost Items — monitor allowances and ensure appropriate
authorization, valuation, documentation, and reconciliation.
4. Subcontractor
Commercial Management — review subcontract scopes, measurement, valuations,
variations, claims, retention, payment, and account reconciliation.
5. Extension
of Time and Time-Related Cost — understand the relationship between delays,
programme impacts, prolongation costs, preliminaries, and contractual
provisions.
6. Delay,
Disruption, and Acceleration — examine the commercial implications of
resequencing, productivity loss, access constraints, changes, acceleration, and
programme disruption.
7. Claims
Management and Commercial Evidence — understand entitlement, notification,
causation, quantum, contemporary records, and claim substantiation.
8. Commercial
Records and Audit Trails — establish effective requirements for site diaries,
correspondence, instructions, labour records, plant records, delivery notes,
photographs, programmes, and progress reports.
9. Dispute
Avoidance and Resolution — examine negotiation, commercial meetings, mediation,
adjudication, arbitration, and other recognized approaches to dispute
management.
10. Case Study:
Variation and Delay Management — assess a complex change and delay scenario,
identify contractual and financial exposures, and develop a management response
and escalation plan.
Day
8: Project Cost Control, Digital Tools, BIM, and Performance Dashboards
Module 8: Project Cost Control, Digital
Tools, BIM, and Performance Dashboards
1. Integrated
Project Cost-Control Framework — connect budgets, commitments, actual
expenditure, certified value, variations, forecasts, and final-cost
projections.
2. Cost
Breakdown Structures and Cost Codes — establish managerial cost structures for
work packages, trades, procurement packages, subcontractors, and project
overheads.
3. Cost
Variance and Trend Management — interpret cost variances, emerging trends,
forecast changes, and corrective-action requirements.
4. Cash-Flow
and Funding Management — review planned expenditure, procurement commitments,
payment timing, certified values, retention, and projected cash requirements.
5. Estimate
at Completion and Cost-to-Complete — assess remaining work, commitments,
productivity, variations, risks, and expected final project cost.
6. Excel
for Construction Cost Management — apply spreadsheets for budget control,
tender comparison, valuation, variation tracking, cash flow, forecasting, and
management reporting.
7. Digital
Quantity Surveying and Commercial Systems — examine electronic measurement,
estimating databases, document management, cost-control platforms, and
commercial data validation.
8. BIM
and 5D Cost Management — understand how building information models can support
quantity extraction, cost association, change management, forecasting, and
commercial visualization.
9. Management
Dashboards and Commercial KPIs — establish indicators for budget performance,
forecast accuracy, variation exposure, claims, procurement, cash flow, and
commercial risk.
10. Exercise:
Executive Cost Dashboard — build and interpret a simulated project cost
dashboard, identify emerging cost issues, and prepare a management-level
performance briefing.
Day
9: Advanced Cost Forecasting, Lifecycle Economics, Sustainability, and
Strategic Management
Module 9: Advanced Cost Forecasting,
Lifecycle Economics, Sustainability, and Strategic Management
1. Advanced
Cost Forecasting Techniques — develop cost-to-complete and
estimate-at-completion forecasts using current performance, remaining
quantities, commitments, productivity, and risk.
2. Cost
Sensitivity and Scenario Analysis — assess the effect of changes in quantities,
rates, productivity, inflation, programme, procurement, and risk assumptions.
3. Inflation,
Escalation, and Market Risk — evaluate material-price volatility, labour
escalation, energy costs, logistics, currency exposure, and supply-chain
pressures.
4. Commercial
Risk Quantification — introduce probability and consequence assessment,
sensitivity analysis, risk allowances, scenario planning, and quantitative risk
concepts.
5. Whole-Life
Costing and Lifecycle Economics — evaluate capital expenditure, operating
costs, maintenance, replacement, energy, disposal, and residual-value
considerations.
6. Sustainable
Construction Cost Management — assess the cost implications of energy
efficiency, renewable systems, water efficiency, low-carbon materials, waste
reduction, and circular construction.
7. Lifecycle
Value Engineering — compare design and construction alternatives based on
initial cost, durability, performance, maintenance, operational requirements,
and long-term value.
8. Supply-Chain
Resilience and Strategic Procurement — evaluate supplier dependency, long-lead
items, market capacity, logistics, alternative sourcing, procurement
contingencies, and strategic partnerships.
9. Case
Study: Strategic Cost and Investment Decision — assess alternative project
solutions using capital cost, lifecycle cost, risk, sustainability, operational
performance, and long-term value.
10. Exercise:
Management Scenario Planning — develop multiple project cost scenarios,
identify critical sensitivities, evaluate commercial risks, and prepare a strategic
cost-management briefing.
Day
10: Final Accounts, Commercial Closeout, Governance, and Integrated Management
Capstone
Module 10: Final Accounts, Commercial
Closeout, Governance, and Integrated Management Capstone
1. Final
Measurement and Quantity Reconciliation — understand the process of reconciling
actual quantities, BOQ quantities, approved variations, omissions, and
additions.
2. Final
Account Structure and Review — evaluate contract value, variations, provisional
sums, dayworks, claims, adjustments, deductions, and other final-account
components.
3. Subcontract
Final Account Management — review subcontract measurements, valuations,
changes, claims, deductions, retention, payments, and unresolved commercial
matters.
4. Final
Account Negotiation and Settlement — apply structured review, evidence
analysis, negotiation, agreement documentation, and settlement controls.
5. Completion,
Defects, Warranties, and Closeout — understand completion documentation,
defects-liability requirements, warranties, outstanding works, and commercial
closeout.
6. Retention,
Bonds, Guarantees, and Securities Release — monitor completion conditions and
commercial requirements for releasing financial securities.
7. Final
Cost Reporting and Lessons Learned — compare approved budget, tender value,
contract value, changes, actual cost, forecast accuracy, and final account.
8. Management
Reporting and Commercial Governance — prepare management dashboards, executive
cost reports, risk summaries, decision papers, escalation reports, and
lessons-learned records.
9. Integrated
Case Study: End-to-End Quantity Surveying Management — manage a simulated
project from budgeting and procurement through tendering, contract
administration, variations, claims, cost forecasting, final account, and
closeout.
10. Capstone
Exercise: Managerial Quantity Surveying Project Review — complete and present
an integrated management portfolio covering cost planning, tender evaluation,
procurement strategy, commercial risk, valuation, variations, cost control,
forecasting, lifecycle economics, final account, and strategic management
recommendations.


