Training course
Overview
Microsoft
Project Masterclass for Managers is a comprehensive professional training
course designed to develop the practical knowledge and management skills
required to use Microsoft Project effectively for planning, scheduling,
monitoring, controlling, and reporting projects. The course provides managers
and project professionals with a structured understanding of Microsoft Project
functionality, including project setup, task planning, work breakdown
structures, dependencies, calendars, resources, costs, baselines, progress
tracking, critical path analysis, earned value management, reporting, and
project performance control. It combines Microsoft Project capabilities with
established project management principles and practical project-controls
techniques to help participants transform project requirements into realistic
and manageable project schedules.
The
primary purpose of effective Microsoft Project management is to provide
managers with reliable visibility into project scope, timelines, resources,
costs, dependencies, milestones, risks, and performance. Participants will
learn how to build professional project schedules, establish logical
relationships between activities, develop resource-loaded plans, identify
critical activities, manage constraints, create baselines, update project
progress, analyze variances, forecast completion dates, and communicate project
status to stakeholders. The course also emphasizes schedule quality, realistic
estimating, resource optimization, change control, performance measurement, and
management reporting using Microsoft Project's practical scheduling and
reporting capabilities.
Modern
project environments require managers to coordinate increasingly complex
projects involving multiple teams, competing priorities, limited resources,
changing requirements, compressed schedules, remote collaboration, and
demanding stakeholder expectations. Microsoft Project can provide a powerful
platform for integrating project scope, schedule, resources, cost information,
and performance data when it is configured and used correctly. This masterclass
therefore addresses both the technical use of Microsoft Project and the
managerial principles required to create useful project schedules, maintain
schedule integrity, identify emerging delays, manage resource conflicts,
evaluate project alternatives, and support evidence-based management decisions.
Participants will also explore practical applications of Microsoft Project
within predictive, hybrid, and organizational project-management environments.
Microsoft
Project Masterclass for Managers is therefore suitable for project managers,
programme managers, PMO professionals, operations managers, department heads,
project planners, project controls specialists, team leaders, consultants,
engineers, business analysts, and other professionals responsible for managing
project delivery. The course combines Microsoft Project tools and features,
project scheduling standards and frameworks, practical templates, scheduling
exercises, resource-management workshops, critical-path analysis, cost and
performance-control techniques, case studies, management reporting, and
real-world project scenarios. Participants progressively develop the ability to
build, analyze, control, and communicate professional project schedules while
using Microsoft Project as a practical management and project-controls tool.
Course
Duration
10
Days (80 Hours)
Target
Participants
This
course is suitable for:
•
Chief Executive Officers (CEOs)
•
Chief Operating Officers (COOs)
•
Directors and Senior Executives
•
Project Directors
•
Project Managers
•
Senior Project Managers
•
Programme Managers
•
Portfolio Managers
•
Project Management Office (PMO) Professionals
•
Project Controls Managers
•
Project Planners and Schedulers
•
Planning Engineers
•
Cost and Project Controls Professionals
•
Operations Managers
•
Department Heads
•
Team Leaders and Supervisors
•
Business Analysts
•
Engineers and Technical Professionals
•
Construction and Infrastructure Professionals
•
IT and Technology Project Professionals
•
Consultants and Management Consultants
•
Resource Managers
•
Professionals Responsible for Project Planning, Scheduling, Monitoring, and
Control
Course
Objectives
By
the end of the training, participants will be able to:
•
Understand the principles and applications of Microsoft Project in professional
project management.
•
Understand project scheduling concepts, terminology, standards, and best
practices.
•
Configure Microsoft Project for different organizational and project
environments.
•
Create professional project files and establish appropriate project calendars.
•
Develop Work Breakdown Structures (WBS) and structured project schedules.
•
Create tasks, milestones, summary tasks, and deliverables.
•
Establish logical relationships and dependencies between project activities.
•
Apply appropriate task types, constraints, deadlines, and scheduling options.
•
Develop realistic project schedules using sound estimating and sequencing
practices.
•
Create and manage project resources, resource calendars, and resource
assignments.
•
Develop resource-loaded schedules and analyze resource utilization.
•
Identify resource overallocations and apply practical resource-leveling
techniques.
•
Develop project cost estimates and integrate resource and task costs.
•
Establish project baselines for performance measurement and control.
•
Update project schedules using actual progress, remaining duration, actual
work, and status dates.
•
Monitor project performance against approved baselines.
•
Analyze schedule variance, cost variance, and project trends.
•
Identify and analyze the project critical path and near-critical activities.
•
Apply float and slack analysis to support project decision-making.
•
Use Microsoft Project views, tables, filters, groups, and custom fields
effectively.
•
Develop professional project dashboards, reports, and management presentations.
•
Apply earned value management concepts within Microsoft Project.
•
Calculate and interpret key project performance indicators.
•
Analyze project delays and develop schedule recovery strategies.
•
Apply what-if analysis and alternative scheduling scenarios.
•
Integrate project risks, issues, assumptions, and changes into project
scheduling.
•
Apply effective project change-control and baseline-management practices.
•
Manage recurring tasks, deadlines, constraints, and complex project calendars.
•
Apply Microsoft Project techniques to large and multi-phase projects.
•
Understand the use of Microsoft Project within predictive, agile, and hybrid
project environments.
•
Develop practical project-management templates and scheduling standards.
•
Improve project forecasting, decision-making, stakeholder communication, and
project governance.
•
Develop an integrated Microsoft Project-based project planning and control
system.
Course
Content
Day
1: Foundations of Microsoft Project and Professional Project Scheduling
Module
1: Microsoft Project Fundamentals, Project Setup, and Scheduling Principles
Topics
- Introduction to Microsoft Project and
Professional Project Management
- Purpose and
capabilities of Microsoft Project
- Microsoft
Project within the project-management lifecycle
- Project
planning versus project scheduling
- Project
scope, schedule, cost, and resource integration
- Microsoft
Project terminology
- Project
manager responsibilities
- Common
scheduling mistakes
- Microsoft
Project best practices
- Project
Management Standards, Frameworks, and Scheduling Principles
- PMI
project-management principles
- PMBOK-aligned
scheduling concepts
- Project
schedule management
- Work
Breakdown Structure (WBS)
- Critical
Path Method (CPM)
- Schedule
baseline concepts
- Project
controls principles
- Schedule
quality standards and best practices
- Microsoft
Project Interface and Navigation
- Ribbon and
commands
- Project
views
- Gantt Chart
- Task Sheet
- Timeline
- Project
Information
- Status bar
and navigation
- Customizing
the working environment
- Creating
and Configuring a New Project
- Starting a
project
- Project
start and finish dates
- Project
calendar selection
- Project
properties
- Project
information
- Scheduling
options
- Project
defaults
- File-management
practices
- Project
Calendars and Working Time
- Standard
calendars
- Project
calendars
- Resource
calendars
- Task
calendars
- Working and
non-working time
- Holidays and
organizational shutdowns
- Shift
patterns
- Calendar
exceptions
- Creating
Tasks and Project Structure
- Entering
project activities
- Task names
- Task
durations
- Summary
tasks
- Subtasks
- Milestones
- Deliverables
- Task
organization
- Developing
the Work Breakdown Structure in Microsoft Project
- WBS
principles
- Deliverable
decomposition
- WBS coding
- Indentation
and outlining
- Work
packages
- Summary-level
planning
- WBS quality
checks
- Practical
WBS development
- Task
Scheduling and Duration Estimation
- Manual and
automatic scheduling
- Duration
estimating
- Effort
versus duration
- Task
calendars
- Estimating
uncertainty
- Three-point
estimating
- Expert
judgment
- Schedule
realism
- Practical
Exercise: Building a Basic Project Schedule
- Create a new
project
- Configure
project information
- Establish a
project calendar
- Develop the
WBS
- Enter tasks
and milestones
- Assign task
durations
- Review the
Gantt Chart
- Validate the
initial schedule
- Case Study:
Developing a Management-Level Project Schedule
- Analyze
project objectives
- Define
deliverables
- Develop
project WBS
- Create
project activities
- Establish
project milestones
- Configure
calendars
- Develop the
initial schedule
- Present the
project schedule to management
Day
2: Task Dependencies, Scheduling Logic, and Critical Path
Module
1: Advanced Task Relationships, Schedule Logic, and Critical Path Analysis
Topics
- Understanding Task Dependencies
- Finish-to-Start
relationships
- Start-to-Start
relationships
- Finish-to-Finish
relationships
- Start-to-Finish
relationships
- Logical
relationships
- Dependency
types
- Internal and
external dependencies
- Dependency
management best practices
- Creating
and Managing Predecessors and Successors
- Linking
activities
- Predecessor
fields
- Successor
relationships
- Dependency
validation
- Removing
unnecessary links
- Avoiding
excessive constraints
- Relationship
documentation
- Schedule
logic quality
- Leads,
Lags, and Timing Relationships
- Lead
concepts
- Lag concepts
- Positive and
negative lag
- Appropriate
use of lag
- Lead and lag
risks
- Alternative
relationship modeling
- Schedule
transparency
- Best
practices
- Task
Constraints and Deadlines
- Constraint
types
- As Soon As
Possible
- As Late As
Possible
- Must Start
On
- Must Finish
On
- Start No
Earlier Than
- Finish No
Later Than
- Deadline
management
- Critical
Path Method (CPM)
- Critical
path principles
- Critical
activities
- Critical
path identification
- Total float
- Free float
- Near-critical
activities
- Critical-path
sensitivity
- Management
implications
- Schedule
Analysis and Logic Quality
- Open-ended
activities
- Dangling
activities
- Excessive
constraints
- Negative
float
- Excessive
float
- Invalid
relationships
- Schedule
integrity
- Schedule
quality review
- Milestones
and Key Management Dates
- Project
milestones
- Phase-gate
milestones
- Decision
milestones
- Contract
milestones
- Regulatory
milestones
- Management
milestones
- Milestone
tracking
- Milestone
reporting
- Schedule
Optimization and Sequencing
- Activity
sequencing
- Parallel
activities
- Fast-tracking
- Schedule
compression
- Crashing
- Resource
considerations
- Dependency
optimization
- Schedule
trade-offs
- Practical
Exercise: Critical Path and Schedule Logic Analysis
- Create
activity relationships
- Review
predecessor and successor logic
- Identify
critical activities
- Analyze
float
- Identify
schedule constraints
- Detect logic
problems
- Correct
schedule issues
- Assess
completion-date impact
- Case Study:
Recovering a Delayed Project Schedule
- Analyze
current schedule
- Identify
critical-path delays
- Determine
root causes
- Evaluate
fast-tracking options
- Evaluate
crashing options
- Assess
schedule risks
- Develop
recovery actions
- Present a
revised management schedule
Day
3: Resource Management, Workload, and Resource Leveling
Module
1: Resource Planning, Allocation, and Optimization in Microsoft Project
Topics
- Resource
Management Fundamentals
- Resource
planning principles
- Human
resources
- Equipment
resources
- Material
resources
- Resource
availability
- Resource
capacity
- Resource
ownership
- Resource-management
best practices
- Creating
and Configuring Resources
- Resource
Sheet
- Resource
names
- Resource
types
- Standard
rates
- Overtime
rates
- Maximum
units
- Resource
calendars
- Resource
attributes
- Assigning
Resources to Tasks
- Resource
assignments
- Work and
duration
- Units
- Task effort
- Assignment
calculations
- Multiple-resource
assignments
- Assignment
validation
- Resource
utilization
- Understanding Work, Duration, and Units
- Work
calculations
- Duration
calculations
- Resource
units
- Task types
- Fixed units
- Fixed work
- Fixed
duration
- Effort-driven
scheduling
- Resource
Calendars and Availability
- Individual
calendars
- Working
patterns
- Leave and
absence
- Shift
schedules
- Resource
availability periods
- Capacity
planning
- Resource
constraints
- Calendar
conflicts
- Identifying Resource Overallocations
- Overallocated
resources
- Resource
Graph
- Resource
Usage view
- Overallocation
indicators
- Workload
analysis
- Capacity
gaps
- Priority
conflicts
- Management
escalation
- Resource
Leveling and Optimization
- Resource
leveling principles
- Automatic
leveling
- Manual
leveling
- Leveling
delays
- Splitting
tasks
- Adjusting
assignments
- Protecting
critical activities
- Leveling
trade-offs
- Resource
Planning for Complex Projects
- Shared
resources
- Multi-project
resource conflicts
- Resource
pools
- Functional
resources
- Specialist
resources
- Resource
bottlenecks
- Capacity
forecasting
- Strategic
resource allocation
- Practical
Exercise: Building and Leveling a Resource-Loaded Schedule
- Create
resource list
- Establish
resource availability
- Assign
resources
- Analyze
workload
- Identify
overallocations
- Apply
leveling
- Evaluate
completion-date changes
- Optimize
resource assignments
- Case Study:
Managing a Resource-Constrained Project
- Analyze
resource demand
- Identify
bottleneck resources
- Evaluate
allocation conflicts
- Develop
resource priorities
- Apply
leveling strategies
- Assess
schedule impact
- Recommend
management actions
- Present
resource-optimization strategy
Day
4: Project Costs, Budgets, and Financial Control
Module
1: Cost Management, Budgeting, and Financial Analysis Using Microsoft Project
Topics
- Project
Cost Management Fundamentals
- Project cost
concepts
- Cost
estimating
- Budget
development
- Cost
baselines
- Cost control
- Resource
costs
- Fixed costs
- Project
financial governance
- Configuring Resource Rates and Costs
- Standard
rates
- Overtime
rates
- Cost per use
- Effective
rate dates
- Resource
cost changes
- Multiple
rate tables
- Cost
assumptions
- Rate
validation
- Assigning
Costs to Project Activities
- Resource-based
costs
- Fixed costs
- Material
costs
- Assignment
costs
- Task-level
costs
- Summary-task
costs
- Cost
aggregation
- Cost
validation
- Developing
Project Budgets
- Budget
planning
- Cost
estimates
- Time-phased
budgets
- Budget
allocation
- Baseline
budget
- Funding
requirements
- Management
reserves
- Budget
governance
- Cash Flow
and Time-Phased Cost Analysis
- Cost
distribution
- Monthly cost
profiles
- Planned
expenditure
- Cash-flow
forecasting
- Funding
schedules
- Cost peaks
- Financial
resource planning
- Management
reporting
- Cost
Baselines and Project Financial Control
- Baseline
concepts
- Cost
baseline
- Baseline
comparison
- Approved
budgets
- Baseline
integrity
- Change
control
- Cost
variance
- Financial
governance
- Cost
Variance and Management Analysis
- Planned
costs
- Actual costs
- Remaining
costs
- Cost
variance
- Forecast
costs
- Cost trends
- Budget
pressure
- Corrective
action
- Integrating Microsoft Project with
Project Controls
- Cost control
- Schedule
control
- Resource
control
- EVM
integration
- Project
accounting
- Cost
reporting
- Data
reconciliation
- Project-controls
governance
- Practical
Exercise: Developing a Project Cost Baseline
- Configure
resource rates
- Assign
project resources
- Add fixed
costs
- Develop cost
estimates
- Time-phase
costs
- Establish
baseline
- Review cost
reports
- Analyze
financial exposure
- Case Study:
Managing a Project Facing Budget Pressure
- Analyze
project cost data
- Identify cost
drivers
- Review
resource costs
- Compare
baseline and forecast
- Identify cost
variances
- Evaluate
corrective actions
- Develop a
revised cost-control strategy
- Present
financial recommendations
Day
5: Baselines, Progress Tracking, and Performance Control
Module
1: Project Baselines, Status Updates, and Schedule Performance Management
Topics
- Establishing the Project Baseline
- Baseline
purpose
- Scope
baseline
- Schedule
baseline
- Cost
baseline
- Baseline
approval
- Baseline
integrity
- Baseline
documentation
- Management
authorization
- Saving and
Managing Multiple Baselines
- Baseline
storage
- Multiple
baselines
- Baseline
comparison
- Interim
plans
- Baseline
selection
- Baseline
reporting
- Change
implications
- Governance
considerations
- Project
Status Dates and Data Dates
- Status-date
concepts
- Reporting
periods
- Data-date
management
- Schedule
update cycles
- Progress
cut-off
- Period-end
procedures
- Reporting
consistency
- Status-date
best practices
- Updating
Actual Progress
- Percent
complete
- Actual start
- Actual
finish
- Actual
duration
- Remaining
duration
- Actual work
- Remaining
work
- Progress
validation
- Tracking
Project Performance Against Baseline
- Tracking
Gantt
- Baseline
bars
- Variance
fields
- Start
variance
- Finish
variance
- Duration
variance
- Cost
variance
- Performance
interpretation
- Schedule
Variance and Delay Analysis
- Planned
versus actual dates
- Delay
identification
- Critical-path
movement
- Float
consumption
- Slippage
analysis
- Root-cause
investigation
- Delay
documentation
- Recovery
planning
- Corrective
Action and Schedule Recovery
- Recovery
strategies
- Resource
reallocation
- Fast-tracking
- Crashing
- Scope
sequencing
- Milestone
recovery
- Management
escalation
- Recovery-plan
monitoring
- Change
Control and Baseline Management
- Change
requests
- Schedule
impacts
- Cost impacts
- Approved
changes
- Baseline
revisions
- Change logs
- Configuration
control
- Audit trails
- Practical
Exercise: Updating and Controlling a Live Project
- Set status
date
- Enter actual
progress
- Update
remaining work
- Analyze
baseline variance
- Identify
delayed activities
- Review
critical path
- Develop
recovery actions
- Produce
project-status report
- Case Study:
Turning Around a Project With Significant Schedule Variance
- Review
approved baseline
- Analyze
current progress
- Identify
delay drivers
- Evaluate
resource options
- Develop
recovery scenarios
- Update
project schedule
- Compare
alternative outcomes
- Present
recovery recommendations
Day
6: Advanced Scheduling, What-If Analysis, and Scenario Planning
Module
1: Advanced Microsoft Project Scheduling and Management Decision Support
Topics
- Advanced
Scheduling Techniques
- Complex task
relationships
- Multi-level
schedules
- Cross-phase
dependencies
- External
dependencies
- Schedule
constraints
- Advanced
calendars
- Recurring
activities
- Schedule
optimization
- Working
with Recurring Tasks and Complex Activities
- Recurring
meetings
- Periodic
inspections
- Maintenance
activities
- Reporting
cycles
- Repetitive
work
- Recurring
task configuration
- Calendar
interactions
- Practical
applications
- Deadline
and Constraint Management
- Deadline
indicators
- Constraint
monitoring
- Constraint
impact
- Hard versus
soft constraints
- Regulatory
dates
- Contractual
dates
- Management
commitments
- Constraint-risk
management
- What-If
Analysis and Alternative Project Scenarios
- Scenario
development
- Alternative
schedules
- Resource
scenarios
- Cost
scenarios
- Duration
scenarios
- Baseline
comparison
- Decision
criteria
- Scenario
documentation
- Schedule
Compression and Acceleration
- Fast-tracking
- Crashing
- Overtime
- Additional
resources
- Parallel
work
- Scope
sequencing
- Acceleration
risks
- Cost and
schedule trade-offs
- Managing
Multi-Project Environments
- Master
projects
- Subprojects
- Shared
resources
- Cross-project
dependencies
- Portfolio
visibility
- Resource
conflicts
- Consolidated
reporting
- Governance
challenges
- Advanced
Filters, Groups, Tables, and Views
- Custom
filters
- Grouping
- Custom
tables
- Critical
tasks
- Late tasks
- Resource
views
- Cost views
- Management-specific
views
- Custom
Fields and Project Information Management
- Custom text
fields
- Number
fields
- Date fields
- Flag fields
- Formulas
- Indicators
- Custom
categories
- Data
consistency
- Practical
Workshop: Building Alternative Project Scenarios
- Establish
current baseline
- Develop
accelerated scenario
- Develop
resource-constrained scenario
- Compare
completion dates
- Compare
costs
- Analyze
critical paths
- Evaluate
risks
- Recommend
preferred scenario
- Case Study:
Selecting the Best Recovery Strategy for a Complex Project
- Analyze
project constraints
- Identify
schedule drivers
- Develop
alternative scenarios
- Evaluate
resource requirements
- Assess cost
implications
- Compare
project outcomes
- Evaluate
stakeholder priorities
- Recommend the
optimal strategy
Day
7: Reporting, Dashboards, and Stakeholder Communication
Module
1: Project Reporting, Data Visualization, and Executive Management Information
Topics
- Principles
of Effective Project Reporting
- Reporting
objectives
- Audience
requirements
- Management
information
- Exception
reporting
- Decision-oriented
reporting
- Reporting
frequency
- Data
accuracy
- Reporting
governance
- Microsoft
Project Views for Management
- Gantt Chart
views
- Tracking
Gantt
- Resource
views
- Calendar
views
- Network
Diagram
- Timeline
- Task Usage
- Resource
Usage
- Project
Status Reports
- Schedule
status
- Cost status
- Resource
status
- Milestone
status
- Critical-path
status
- Variance
analysis
- Forecast
information
- Management
commentary
- Creating
Visual Project Dashboards
- Dashboard
principles
- KPI
selection
- Schedule
indicators
- Cost
indicators
- Resource
indicators
- Milestone
indicators
- Risk
indicators
- Executive
visualization
- Project
Timeline and Executive Communication
- Timeline
development
- Major
milestones
- Key
deliverables
- Decision
points
- Management
presentations
- Stakeholder
communication
- Executive
summaries
- Communication
best practices
- Filters
and Reports for Exception Management
- Late tasks
- Critical
tasks
- Overallocated
resources
- High-cost
activities
- Milestone
exceptions
- Variance
thresholds
- Management
attention areas
- Exception
reporting
- Communicating Schedule Risks and
Performance
- Performance
narratives
- Schedule
risk communication
- Root-cause
explanations
- Corrective-action
communication
- Stakeholder
expectations
- Escalation
- Decision
requests
- Transparent
reporting
- Exporting
and Sharing Project Information
- Export
options
- Report
formatting
- Spreadsheet
integration
- Presentation
preparation
- PDF
reporting
- Data-sharing
considerations
- Version
control
- Information
governance
- Practical
Exercise: Developing an Executive Project Dashboard
- Select
management KPIs
- Configure
project views
- Create
management filters
- Develop
timeline
- Analyze
project exceptions
- Prepare
dashboard content
- Develop
management commentary
- Present the
dashboard
- Case Study:
Communicating Project Performance to Senior Management
- Analyze
project status
- Identify
critical issues
- Develop
executive dashboard
- Summarize
schedule performance
- Highlight
resource constraints
- Explain cost
trends
- Recommend
management actions
- Conduct
executive project review
Day
8: Earned Value Management, Forecasting, and Project Analytics
Module
1: Performance Measurement, Earned Value, Forecasting, and Advanced Project
Analytics
Topics
- Earned
Value Management Fundamentals
- Earned Value
Management principles
- Planned
Value (PV)
- Earned Value
(EV)
- Actual Cost
(AC)
- Performance
Measurement Baseline
- Integration
of scope, schedule, and cost
- EVM
terminology
- EVM best
practices
- Cost and
Schedule Performance Indicators
- Cost
Variance
- Schedule
Variance
- Cost
Performance Index
- Schedule
Performance Index
- Performance
thresholds
- Trend
analysis
- Management
interpretation
- Corrective
actions
- EVM Data
and Microsoft Project
- Baseline
data
- Actual
progress
- Earned value
settings
- Status dates
- EVM tables
- Performance
measurement
- Data
validation
- Reporting
- Forecasting Project Completion
- Estimate at
Completion
- Estimate to
Complete
- Variance at
Completion
- To-Complete
Performance Index
- Completion-date
forecasting
- Forecast
assumptions
- Forecast
uncertainty
- Management
judgment
- Schedule
and Cost Trend Analysis
- Historical
performance
- Trend
identification
- Cumulative
variance
- Current-period
variance
- Performance
deterioration
- Early-warning
indicators
- Forecast
changes
- Corrective
management
- Project
Performance Dashboards and Analytics
- Performance
indicators
- Trend charts
- Variance
dashboards
- Resource
analytics
- Cost
analytics
- Schedule
analytics
- Executive
metrics
- Data-driven
decision-making
- Integrating Risk and Uncertainty into
Project Forecasts
- Schedule
risks
- Cost risks
- Resource
risks
- Risk-response
impacts
- Scenario
analysis
- Contingency
- Forecast
ranges
- Risk-informed
decisions
- Performance Thresholds and Management
Intervention
- Variance
thresholds
- Escalation
criteria
- Early-warning
systems
- Corrective-action
triggers
- Management
reserves
- Recovery
planning
- Governance
- Performance
accountability
- Practical
Exercise: Analyzing Project Performance and Forecasting Completion
- Review
baseline
- Analyze
actual performance
- Calculate
performance indicators
- Identify
trends
- Develop
forecasts
- Evaluate
risks
- Create
performance dashboard
- Recommend
corrective actions
- Case Study:
Forecasting a Project With Cost and Schedule Deterioration
- Analyze
project data
- Identify
performance trends
- Calculate key
indicators
- Assess
forecast completion
- Evaluate cost
exposure
- Analyze
schedule risk
- Develop
recovery scenarios
- Present an
integrated forecast
Day
9: Risk, Change, Governance, and Enterprise-Level Microsoft Project Management
Module
1: Advanced Project Controls, Risk Integration, Change Management, and
Governance
Topics
- Integrating Project Risk with Microsoft
Project Scheduling
- Risk
identification
- Schedule
risk
- Risk-linked
activities
- Risk
response actions
- Contingency
activities
- Schedule
buffers
- Risk
monitoring
- Risk-informed
scheduling
- Managing
Issues, Assumptions, and Dependencies
- Project
issues
- Assumptions
- Constraints
- External
dependencies
- Internal
dependencies
- Dependency
owners
- Issue
escalation
- Management
response
- Change
Management and Schedule Control
- Change
identification
- Change
requests
- Impact
analysis
- Schedule
impacts
- Cost impacts
- Resource
impacts
- Approval
processes
- Baseline
updates
- Schedule
Governance and Quality Assurance
- Scheduling
standards
- Schedule
review procedures
- Schedule
quality checks
- Naming
conventions
- Coding
structures
- Version
control
- Auditability
- Governance
responsibilities
- Managing
Large and Complex Project Schedules
- Large WBS
structures
- Multi-phase
projects
- Programme
schedules
- Multiple
teams
- Complex
dependencies
- Shared
resources
- Performance
monitoring
- Schedule
scalability
- Microsoft
Project for Predictive, Agile, and Hybrid Environments
- Predictive
project scheduling
- Agile
planning concepts
- Iterative
delivery
- Sprint and
release planning
- Hybrid
scheduling
- Milestone-based
planning
- Backlog and
schedule relationships
- Adaptation
of Microsoft Project
- Project
Governance, Controls, and Audit Readiness
- Project
governance
- Schedule
ownership
- Data
integrity
- Baseline
control
- Change
records
- Performance
evidence
- Audit trails
- Management
accountability
- Organizational Scheduling Standards and
Templates
- Project
scheduling templates
- Standard
calendars
- Standard WBS
structures
- Resource
libraries
- Reporting
templates
- Naming
conventions
- Schedule
quality checklists
- Organizational
lessons learned
- Practical
Workshop: Developing a Project Scheduling Governance Framework
- Define
scheduling standards
- Establish
schedule ownership
- Develop WBS
standards
- Establish
calendar standards
- Define
baseline procedures
- Establish
reporting cycles
- Develop
quality controls
- Create
governance framework
- Case Study:
Managing a Complex Programme With Multiple Projects
- Analyze
programme structure
- Develop
integrated schedules
- Identify
cross-project dependencies
- Manage shared
resources
- Establish
governance
- Develop
reporting standards
- Analyze
programme-level risks
- Present an
enterprise scheduling strategy
Day
10: Masterclass Capstone, Integrated Application, and Management Strategy
Module
1: Advanced Microsoft Project Mastery and Integrated Project Management
Application
Topics
- Advanced
Microsoft Project Masterclass Review
- Project
setup
- WBS
development
- Task
scheduling
- Dependencies
- Critical
path
- Resource
management
- Cost
management
- Baseline and
performance control
- Building a
Complete Professional Project Schedule
- Define
project objectives
- Develop WBS
- Create
activities
- Establish
dependencies
- Assign
resources
- Develop cost
information
- Establish
milestones
- Validate
schedule quality
- Integrated
Schedule, Resource, and Cost Optimization
- Analyze
resource demand
- Identify
bottlenecks
- Analyze
project costs
- Review
critical path
- Evaluate
schedule alternatives
- Optimize
resource assignments
- Assess cost
and schedule trade-offs
- Select
preferred project strategy
- Advanced
Project Scenario and What-If Analysis
- Baseline
scenario
- Accelerated
scenario
- Resource-constrained
scenario
- Budget-constrained
scenario
- Delay
scenario
- Recovery
scenario
- Compare
outcomes
- Management
recommendation
- Integrated
Project Performance and Forecasting
- Update
actual progress
- Analyze
baseline variance
- Review
critical path
- Analyze
resource performance
- Review cost
performance
- Apply EVM
principles
- Develop
completion forecasts
- Identify
corrective actions
- Executive
Project Reporting and Decision Support
- Executive
dashboard
- Project
timeline
- Critical
issues
- Key
milestones
- Resource
status
- Cost status
- Schedule
status
- Management
recommendations
- Practical
Capstone Exercise: Managing a Complete Project in Microsoft Project
- Establish
project structure
- Build
professional schedule
- Configure
resources
- Assign costs
- Establish
baseline
- Update
project progress
- Analyze
performance
- Develop
recovery actions
- Produce
management reports
- Present
project-control strategy
- Integrated
Case Study: Turning Around a Complex Project
- Analyze
project objectives
- Review
current project schedule
- Identify
critical problems
- Diagnose
resource constraints
- Analyze cost
and schedule variance
- Evaluate
project risks
- Develop
recovery scenarios
- Select
corrective strategy
- Update the
Microsoft Project schedule
- Present
recommendations to senior management
- Final
Assessment: Microsoft Project Management Competency
- Project
scheduling assessment
- WBS
development assessment
- Dependency
and critical-path analysis
- Resource-management
assessment
- Cost-management
assessment
- Baseline and
progress-control assessment
- Performance-analysis
assessment
- Reporting
and dashboard assessment
- Scenario-based
management decisions
- Integrated
Microsoft Project practical assessment
- Course
Review, Personal Action Plan, and Workplace Implementation Strategy
- Review key
Microsoft Project capabilities
- Identify
personal competency gaps
- Develop
workplace implementation priorities
- Establish
project scheduling standards
- Define
reporting and governance practices
- Develop
schedule-quality procedures
- Establish
continuous-improvement practices
- Define
stakeholder communication strategies
- Develop a
30-60-90 day implementation plan
- Personal action plan and workplace Microsoft Project implementation strategy