Earned Value Management (EVM) Systems is a comprehensive professional training course designed to provide participants with the knowledge, skills, tools, and techniques required to plan, implement, monitor, analyze, and control project performance using integrated scope, schedule, and cost management principles. Earned Value Management is a widely recognized project-control methodology that enables organizations to objectively measure project performance against an approved baseline and identify cost and schedule variances at an early stage. The course provides a practical understanding of EVM concepts, terminology, formulas, performance indices, forecasting techniques, control-account structures, baseline development, and performance measurement processes aligned with recognized project management and project-controls practices.

The primary purpose of an effective Earned Value Management System is to provide reliable, objective, and timely information about project performance and forecast outcomes. Participants will learn how Planned Value (PV), Earned Value (EV), and Actual Cost (AC) are established and used to calculate Cost Variance (CV), Schedule Variance (SV), Cost Performance Index (CPI), Schedule Performance Index (SPI), Estimate at Completion (EAC), Estimate to Complete (ETC), Variance at Completion (VAC), and To-Complete Performance Index (TCPI). The course also covers the development and maintenance of Performance Measurement Baselines (PMBs), Work Breakdown Structures (WBS), Organizational Breakdown Structures (OBS), control accounts, work packages, planning packages, budgets, actual-cost data, forecasting models, variance analysis, and management reporting.

Modern projects increasingly require sophisticated project-controls capabilities because organizations operate in environments characterized by complex programmes, tight budgets, accelerated delivery schedules, changing requirements, supply-chain challenges, resource constraints, inflation, technological transformation, and increased executive demand for accurate project forecasts. EVM provides project managers, project controllers, finance professionals, programme managers, and executives with a structured framework for integrating project scope, schedule, and cost information into meaningful performance intelligence. Participants will explore EVM implementation challenges, data quality, baseline integrity, progress measurement methods, accounting considerations, forecasting uncertainty, change control, risk integration, management reserves, and the use of dashboards and digital project-controls systems to improve decision-making.

Earned Value Management (EVM) Systems is therefore suitable for project managers, project controls professionals, cost engineers, planners, schedulers, programme managers, PMO professionals, finance and accounting specialists, commercial managers, contract managers, procurement professionals, engineers, quantity surveyors, project analysts, consultants, and senior executives responsible for project performance and governance. The course combines EVM standards and frameworks, practical calculation exercises, spreadsheet-based tools, performance dashboards, project-controls templates, case studies, workshops, variance-analysis scenarios, forecasting exercises, and real-world project situations. Participants progressively develop the ability to design and operate an effective EVM system, interpret performance data, diagnose project problems, produce reliable forecasts, communicate project performance to stakeholders, and support corrective management action.

Course Duration

5 Days (40 Hours)

Target Participants

This course is suitable for:

• Chief Executive Officers (CEOs)

• Chief Operating Officers (COOs)

• Directors and Senior Executives

• Project Directors

• Project Managers

• Programme Managers

• Portfolio Managers

• Project Controls Managers

• Project Controls Professionals

• Earned Value Management (EVM) Practitioners

• Cost Engineers

• Planning and Scheduling Professionals

• Cost Controllers

• Project Accountants

• Finance Managers and Analysts

• Commercial Managers

• Contract Managers

• Quantity Surveyors

• Engineers and Technical Professionals

• Project Management Office (PMO) Professionals

• Business Analysts

• Procurement and Supply Chain Professionals

• Risk Management Professionals

• Management Consultants

• Professionals Responsible for Project Performance, Cost, Schedule, and Governance

Course Objectives

By the end of the training, participants will be able to:

• Understand the principles, terminology, purpose, and strategic value of Earned Value Management.

• Explain the relationship between scope, schedule, cost, and performance measurement.

• Understand recognized EVM standards, frameworks, and project-controls practices.

• Develop an effective Work Breakdown Structure (WBS) for EVM implementation.

• Understand Organizational Breakdown Structures (OBS), control accounts, work packages, and planning packages.

• Develop and maintain a Performance Measurement Baseline (PMB).

• Establish Planned Value, Earned Value, and Actual Cost data.

• Apply appropriate methods for measuring physical progress and earned value.

• Calculate Cost Variance (CV), Schedule Variance (SV), Cost Performance Index (CPI), and Schedule Performance Index (SPI).

• Interpret EVM performance indicators and identify emerging project-performance problems.

• Conduct integrated cost and schedule variance analysis.

• Apply EVM forecasting techniques, including Estimate at Completion (EAC) and Estimate to Complete (ETC).

• Calculate Variance at Completion (VAC) and To-Complete Performance Index (TCPI).

• Evaluate different EAC forecasting approaches based on project circumstances.

• Understand the relationship between EVM and project budgeting, accounting, scheduling, and cost control.

• Apply baseline change-control principles to protect the integrity of project performance measurement.

• Integrate project risks, assumptions, changes, and uncertainties into EVM analysis.

• Establish effective EVM data collection, validation, reconciliation, and reporting processes.

• Develop EVM dashboards and management reports for different stakeholder levels.

• Identify common EVM implementation problems and develop corrective strategies.

• Apply EVM to fixed-price, cost-reimbursable, engineering, construction, technology, and other project environments.

• Understand EVM applications within predictive, agile, and hybrid project environments.

• Use practical EVM spreadsheets, templates, performance reports, and project-controls tools.

• Analyze real-world project performance data and recommend appropriate management actions.

• Develop an integrated EVM implementation and project-performance management approach.

Course Content

Day 1: Foundations of Earned Value Management

Module 1: Earned Value Management Principles, Standards, and Baseline Development

Topics

  1.  Introduction to Earned Value Management
  2.  
    • Definition and purpose of EVM
    • History and evolution of EVM
    • EVM as an integrated project-control methodology
    • Relationship between scope, schedule, and cost
    • Benefits of objective performance measurement
    • EVM terminology
    • EVM applications across industries
    • Limitations and appropriate use of EVM
  3.  EVM Standards, Frameworks, and Best Practices
  4.  
    • PMI-aligned EVM concepts
    • ANSI/EIA-748 Earned Value Management System principles
    • Government and major-programme EVM practices
    • Integrated project-control principles
    • EVM system characteristics
    • Organizational EVM policies
    • EVM governance
    • EVM implementation best practices
  5.  Work Breakdown Structure (WBS) for EVM
  6.  
    • WBS principles
    • Deliverable-oriented decomposition
    • WBS levels
    • Control-account alignment
    • Work packages
    • Planning packages
    • WBS coding
    • WBS quality checks
  7.  Organizational Breakdown Structure and Responsibility Assignment
  8.  
    • Organizational Breakdown Structure (OBS)
    • Responsibility Assignment Matrix (RAM)
    • Control-account managers
    • Responsibility and accountability
    • Work authorization
    • Organizational alignment
    • Integrated responsibility structures
    • Practical RAM development
  9.  Control Accounts, Work Packages, and Planning Packages
  10.  
    • Control-account concepts
    • Work-package definition
    • Planning-package definition
    • Work authorization
    • Scope ownership
    • Budget allocation
    • Responsibility assignment
    • Control-account documentation
  11.  Performance Measurement Baseline (PMB)
  12.  
    • Definition of the PMB
    • Baseline development
    • Time-phased budgets
    • Budget allocation
    • Schedule integration
    • Cost integration
    • Baseline integrity
    • Management reserve
  13.  Planned Value, Earned Value, and Actual Cost
  14.  
    • Planned Value (PV)
    • Earned Value (EV)
    • Actual Cost (AC)
    • Budgeted cost concepts
    • Actual expenditure
    • Performance measurement periods
    • Data collection
    • Data reconciliation
  15.  Earned Value Measurement Techniques
  16.  
    • 0/100 method
    • 50/50 method
    • Milestone weighting
    • Weighted milestones
    • Percent complete
    • Physical measurement
    • Apportioned effort
    • Level-of-effort considerations
  17.  Practical Exercise: Developing a Basic EVM Baseline
  18.  
    • Develop a project WBS
    • Define control accounts
    • Create work packages
    • Allocate budgets
    • Time-phase planned value
    • Establish performance periods
    • Define measurement methods
    • Prepare an initial PMB
  19. Case Study: Establishing an EVM System for a Major Project
  • Analyze project scope
  • Develop WBS and OBS
  • Create responsibility assignments
  • Establish control accounts
  • Develop the PMB
  • Select progress-measurement techniques
  • Identify EVM governance requirements
  • Present the proposed EVM system

Day 2: EVM Performance Measurement and Variance Analysis

Module 1: Measuring Project Performance Using Earned Value

Topics

  1.  EVM Performance Measurement Cycle
  2.  
    • Status-date concepts
    • Data collection cycles
    • Progress assessment
    • Actual-cost capture
    • Schedule status
    • Performance-period close
    • Data validation
    • Reporting cycles
  3.  Calculating Planned Value, Earned Value, and Actual Cost
  4.  
    • PV calculations
    • EV calculations
    • AC calculations
    • Cumulative versus current-period values
    • Budget allocation
    • Progress measurement
    • Cost recording
    • Data consistency
  5.  Cost Variance and Schedule Variance
  6.  
    • Cost Variance (CV)
    • Schedule Variance (SV)
    • CV formula
    • SV formula
    • Positive and negative variance
    • Favorable and unfavorable performance
    • Variance thresholds
    • Management interpretation
  7.  Cost Performance Index and Schedule Performance Index
  8.  
    • Cost Performance Index (CPI)
    • Schedule Performance Index (SPI)
    • CPI formula
    • SPI formula
    • Index interpretation
    • Performance trends
    • Threshold analysis
    • Management implications
  9.  Integrated Cost and Schedule Performance Analysis
  10.  
    • PV-EV-AC relationships
    • Performance trend analysis
    • Cost and schedule interaction
    • Variance relationships
    • Critical work packages
    • Cumulative performance
    • Current-period performance
    • Integrated project assessment
  11.  Variance Analysis and Root-Cause Investigation
  12.  
    • Variance identification
    • Variance thresholds
    • Root-cause analysis
    • Five Whys
    • Fishbone analysis
    • Corrective-action planning
    • Management response
    • Variance documentation
  13.  EVM Performance Reporting
  14.  
    • Variance reports
    • Performance summaries
    • Control-account reporting
    • Project-level reporting
    • Executive reporting
    • Trend reporting
    • Exception reporting
    • Management commentary
  15.  EVM Data Quality and Validation
  16.  
    • Data accuracy
    • Data completeness
    • Baseline integrity
    • Actual-cost reconciliation
    • Schedule-data consistency
    • Progress validation
    • Accounting reconciliation
    • Audit readiness
  17.  Practical Exercise: Calculating and Interpreting EVM Indicators
  18.  
    • Calculate PV
    • Calculate EV
    • Calculate AC
    • Calculate CV
    • Calculate SV
    • Calculate CPI
    • Calculate SPI
    • Interpret project performance
  19. Case Study: Diagnosing Poor Cost and Schedule Performance
  • Analyze project performance data
  • Identify significant variances
  • Calculate performance indices
  • Investigate root causes
  • Identify critical control accounts
  • Develop corrective actions
  • Prepare management commentary
  • Present an executive performance summary

Day 3: EVM Forecasting, Estimates, and Project Controls

Module 1: Forecasting Project Outcomes Using Earned Value Management

Topics

  1.  EVM Forecasting Principles
  2.  
    • Purpose of forecasting
    • Forecast uncertainty
    • Current performance versus future performance
    • Forecast assumptions
    • Forecasting frequency
    • Data reliability
    • Management judgment
    • Forecast confidence
  3.  Estimate at Completion (EAC)
  4.  
    • Definition of EAC
    • EAC forecasting concepts
    • Forecasting from actual performance
    • CPI-based forecasting
    • CPI and SPI considerations
    • Independent estimates
    • Forecast comparison
    • Selecting appropriate EAC methods
  5.  Estimate to Complete (ETC)
  6.  
    • Definition of ETC
    • Bottom-up ETC
    • Performance-based ETC
    • Remaining-work assessment
    • Cost-to-complete analysis
    • Forecast assumptions
    • ETC validation
    • Management review
  7.  Variance at Completion and To-Complete Performance Index
  8.  
    • Variance at Completion (VAC)
    • VAC interpretation
    • TCPI based on BAC
    • TCPI based on EAC
    • TCPI calculations
    • Performance requirements
    • Feasibility assessment
    • Management implications
  9.  Forecasting Project Schedule Performance
  10.  
    • Schedule forecasting
    • SPI interpretation
    • Schedule trends
    • Critical-path considerations
    • Completion-date forecasts
    • Schedule risk
    • Time contingency
    • Schedule recovery
  11.  Cost Forecasting and Budget Management
  12.  
    • Cost forecasts
    • Budget remaining
    • Cost-to-complete analysis
    • Contingency
    • Management reserve
    • Funding requirements
    • Cash-flow implications
    • Budget decisions
  13.  Integrating EVM with Project Risk and Uncertainty
  14.  
    • Risk-adjusted forecasts
    • Cost uncertainty
    • Schedule uncertainty
    • Risk exposure
    • Contingency
    • Forecast ranges
    • Scenario analysis
    • Risk-informed EAC
  15.  Forecast Accuracy and Management Judgment
  16.  
    • Forecast bias
    • Optimistic forecasting
    • Conservative forecasting
    • Historical performance
    • Data limitations
    • Management judgment
    • Forecast validation
    • Confidence levels
  17.  Practical Exercise: Developing Project Forecasts
  18.  
    • Calculate multiple EAC scenarios
    • Calculate ETC
    • Calculate VAC
    • Calculate TCPI
    • Compare forecasting methods
    • Evaluate assumptions
    • Assess forecast credibility
    • Recommend an appropriate forecast
  19. Case Study: Forecasting a Project Heading Toward Cost Overrun
  • Analyze current EVM data
  • Develop alternative EAC forecasts
  • Assess remaining work
  • Calculate TCPI
  • Evaluate cost pressure
  • Identify risk drivers
  • Develop recovery options
  • Present an executive forecast

Day 4: EVM Implementation, Change Control, and Advanced Applications

Module 1: Implementing and Managing an Effective EVM System

Topics

  1.  EVM System Implementation
  2.  
    • EVM implementation strategy
    • Organizational readiness
    • EVM policies and procedures
    • Roles and responsibilities
    • System configuration
    • Data requirements
    • Implementation governance
    • EVM maturity
  3.  Baseline Change Control
  4.  
    • Baseline integrity
    • Change-control principles
    • Authorized changes
    • Scope changes
    • Budget changes
    • Schedule changes
    • Baseline revisions
    • Undistributed budget
  5.  Management Reserve and Baseline Management
  6.  
    • Management reserve
    • Contingency concepts
    • Authorized use of reserve
    • Baseline adjustments
    • Reserve governance
    • Change documentation
    • Audit trail
    • Performance-reporting implications
  7.  EVM and Integrated Change Management
  8.  
    • Change requests
    • Scope changes
    • Schedule changes
    • Cost changes
    • Risk-driven changes
    • Approved baseline updates
    • Configuration management
    • Change impact analysis
  9.  EVM and Project Scheduling
  10.  
    • Integrated master schedules
    • Schedule baselines
    • Activity relationships
    • Critical path
    • Status updates
    • Progress measurement
    • Schedule performance
    • Schedule-EVM integration
  11.  EVM and Project Accounting
  12.  
    • Actual-cost accounting
    • Accounting periods
    • Cost collection
    • Accruals
    • Commitments
    • Direct and indirect costs
    • Cost reconciliation
    • Accounting-system integration
  13.  EVM for Contracts and Procurement
  14.  
    • Contract performance
    • Supplier EVM
    • Fixed-price contracts
    • Cost-reimbursable contracts
    • Contract budgets
    • Supplier reporting
    • Commercial performance
    • Contractual variance management
  15.  EVM in Agile, Hybrid, and Complex Projects
  16.  
    • EVM in iterative environments
    • Agile performance measurement
    • Incremental value
    • Hybrid baselines
    • Product-oriented budgeting
    • Release forecasting
    • Agile metrics and EVM
    • Adapting EVM to delivery models
  17.  Practical Workshop: Designing an EVM Implementation Framework
  18.  
    • Assess organizational readiness
    • Define EVM governance
    • Develop WBS and control accounts
    • Establish baseline procedures
    • Define data requirements
    • Establish reporting cycles
    • Define change-control processes
    • Develop implementation roadmap
  19. Case Study: Implementing EVM Across a Large Programme
  • Analyze organizational requirements
  • Identify implementation challenges
  • Establish governance
  • Design control-account structures
  • Integrate accounting and scheduling
  • Establish supplier reporting
  • Develop baseline-change controls
  • Present an EVM implementation strategy

Day 5: Advanced EVM Analytics, Reporting, and Integrated Application

Module 1: Advanced Earned Value Analysis, Decision Support, and Capstone Application

Topics

  1.  Advanced EVM Performance Analysis
  2.  
    • Performance trends
    • Cumulative performance
    • Current-period performance
    • Control-account analysis
    • Critical variance analysis
    • Performance thresholds
    • Trend forecasting
    • Management intervention
  3.  EVM Trend Analysis and Early-Warning Indicators
  4.  
    • CPI trends
    • SPI trends
    • Variance trends
    • Forecast deterioration
    • Performance thresholds
    • Early-warning indicators
    • Leading indicators
    • Corrective-action triggers
  5.  Advanced EVM Dashboards and Visualization
  6.  
    • Executive dashboards
    • Control-account dashboards
    • S-curves
    • PV-EV-AC charts
    • CPI and SPI trend charts
    • Variance heat maps
    • Forecast dashboards
    • Management reporting principles
  7.  EVM Integration with Risk Management
  8.  
    • Risk-adjusted performance
    • Risk events and variance
    • Cost and schedule risk
    • Contingency planning
    • Forecast uncertainty
    • Risk response impacts
    • Integrated risk and performance reporting
    • Management decision-making
  9.  EVM Maturity and Continuous Improvement
  10.  
    • EVM capability maturity
    • Process assessment
    • Data-quality improvement
    • Governance improvement
    • Reporting improvement
    • Training and competency
    • Lessons learned
    • Continuous improvement
  11.  Common EVM Problems and Corrective Practices
  12.  
    • Unrealistic baselines
    • Poor progress measurement
    • Inaccurate actual costs
    • Baseline manipulation
    • Weak variance analysis
    • Delayed reporting
    • Poor forecasting
    • Inadequate management action
  13.  Practical EVM Tools, Templates, and Systems
  14.  
    • EVM calculation worksheets
    • WBS templates
    • Control-account templates
    • Responsibility Assignment Matrix
    • Performance Measurement Baseline
    • Risk and issue integration
    • Variance-analysis templates
    • EVM dashboards
    • Forecasting templates
    • Management-reporting templates
  15.  Integrated Case Study: Managing a Complex Project Using EVM
  16.  
    • Analyze project baseline
    • Review PV, EV, and AC
    • Calculate performance indicators
    • Identify cost and schedule variances
    • Develop EAC and ETC forecasts
    • Assess risk and uncertainty
    • Develop corrective actions
    • Prepare executive reporting
    • Recommend management decisions
  17.  Practical Capstone Exercise: Developing a Complete EVM Performance Management System
  18.  
    • Develop project WBS
    • Establish control accounts
    • Develop time-phased baseline
    • Define EV measurement techniques
    • Calculate PV, EV, and AC
    • Perform variance analysis
    • Develop forecasts
    • Create EVM dashboard
    • Develop corrective-action recommendations
    • Present the complete EVM performance-management approach
  19. Final Assessment, Course Review, and Workplace Implementation Strategy
  • Comprehensive EVM knowledge assessment
  • EVM calculation exercise
  • Performance-index interpretation
  • Variance-analysis scenario
  • EAC and ETC forecasting exercise
  • TCPI and VAC assessment
  • EVM dashboard interpretation
  • Baseline-change scenario
  • Integrated project-controls case assessment
  • Personal action plan and workplace EVM implementation strategy

 

Course Schedules:

Dates Fees Location Apply
09/11/2026 - 13/11/2026 $5000 Dubai, UAE Physical Class Online Class
09/11/2026 - 13/11/2026 $2000 Mombasa, Kenya Physical Class Online Class
09/11/2026 - 13/11/2026 $5000 Singapore, Singapore Physical Class Online Class
09/11/2026 - 13/11/2026 $1500 Nairobi, Kenya Physical Class Online Class
09/11/2026 - 13/11/2026 $2500 Kigali, Rwanda Physical Class Online Class
16/11/2026 - 20/11/2026 $2500 Dar es Salaam, Tanzania Physical Class Online Class
16/11/2026 - 20/11/2026 $1500 Nairobi, Kenya Physical Class Online Class
16/11/2026 - 20/11/2026 $6000 Mauritius Physical Class Online Class
23/11/2026 - 27/11/2026 $4500 Pretoria, South Africa Physical Class Online Class
23/11/2026 - 27/11/2026 $5000 Dubai, UAE Physical Class Online Class
23/11/2026 - 27/11/2026 $4000 Johannesburg, South Africa Physical Class Online Class
23/11/2026 - 27/11/2026 $1500 Nairobi, Kenya Physical Class Online Class
30/11/2026 - 04/12/2026 $2500 Kigali, Rwanda Physical Class Online Class
30/11/2026 - 04/12/2026 $1500 Nairobi, Kenya Physical Class Online Class
30/11/2026 - 04/12/2026 $2500 Dar es Salaam, Tanzania Physical Class Online Class
07/12/2026 - 11/12/2026 $6000 Mauritius Physical Class Online Class
07/12/2026 - 11/12/2026 $1500 Nairobi, Kenya Physical Class Online Class
07/12/2026 - 11/12/2026 $2000 Mombasa, Kenya Physical Class Online Class
14/12/2026 - 18/12/2026 $4500 Pretoria, South Africa Physical Class Online Class
14/12/2026 - 18/12/2026 $5000 Singapore, Singapore Physical Class Online Class
14/12/2026 - 18/12/2026 $1500 Nairobi, Kenya Physical Class Online Class
14/12/2026 - 18/12/2026 $4000 Johannesburg, South Africa Physical Class Online Class
21/12/2026 - 25/12/2026 $5000 Dubai, UAE Physical Class Online Class
21/12/2026 - 25/12/2026 $1500 Nairobi, Kenya Physical Class Online Class
28/12/2026 - 01/01/2027 $4000 Johannesburg, South Africa Physical Class Online Class
28/12/2026 - 01/01/2027 $2500 Kigali, Rwanda Physical Class Online Class
28/12/2026 - 01/01/2027 $5000 Singapore, Singapore Physical Class Online Class
28/12/2026 - 01/01/2027 $1500 Nairobi, Kenya Physical Class Online Class
04/01/2027 - 08/01/2027 $1500 Nairobi, Kenya Physical Class Online Class
04/01/2027 - 08/01/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
11/01/2027 - 15/01/2027 $6000 Mauritius Physical Class Online Class
11/01/2027 - 15/01/2027 $1500 Nairobi, Kenya Physical Class Online Class
11/01/2027 - 15/01/2027 $4500 Pretoria, South Africa Physical Class Online Class
11/01/2027 - 15/01/2027 $2000 Mombasa, Kenya Physical Class Online Class
18/01/2027 - 22/01/2027 $1500 Nairobi, Kenya Physical Class Online Class
18/01/2027 - 22/01/2027 $5000 Dubai, UAE Physical Class Online Class
18/01/2027 - 22/01/2027 $4500 Pretoria, South Africa Physical Class Online Class
18/01/2027 - 22/01/2027 $2000 Mombasa, Kenya Physical Class Online Class
25/01/2027 - 29/01/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
25/01/2027 - 29/01/2027 $4000 Johannesburg, South Africa Physical Class Online Class
25/01/2027 - 29/01/2027 $6000 Mauritius Physical Class Online Class
25/01/2027 - 29/01/2027 $1500 Nairobi, Kenya Physical Class Online Class
25/01/2027 - 29/01/2027 $5000 Singapore, Singapore Physical Class Online Class
01/02/2027 - 05/02/2027 $2500 Kigali, Rwanda Physical Class Online Class
01/02/2027 - 05/02/2027 $1500 Nairobi, Kenya Physical Class Online Class
08/02/2027 - 12/02/2027 $1500 Nairobi, Kenya Physical Class Online Class
08/02/2027 - 12/02/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
08/02/2027 - 12/02/2027 $4000 Johannesburg, South Africa Physical Class Online Class
08/02/2027 - 12/02/2027 $6000 Mauritius Physical Class Online Class
08/02/2027 - 12/02/2027 $5000 Dubai, UAE Physical Class Online Class
08/02/2027 - 12/02/2027 $2000 Mombasa, Kenya Physical Class Online Class
15/02/2027 - 19/02/2027 $5000 Singapore, Singapore Physical Class Online Class
15/02/2027 - 19/02/2027 $1500 Nairobi, Kenya Physical Class Online Class
15/02/2027 - 19/02/2027 $2500 Kigali, Rwanda Physical Class Online Class
15/02/2027 - 19/02/2027 $4500 Pretoria, South Africa Physical Class Online Class
22/02/2027 - 26/02/2027 $1500 Nairobi, Kenya Physical Class Online Class
01/03/2027 - 05/03/2027 $4500 Pretoria, South Africa Physical Class Online Class
01/03/2027 - 05/03/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
01/03/2027 - 05/03/2027 $4000 Johannesburg, South Africa Physical Class Online Class
01/03/2027 - 05/03/2027 $1500 Nairobi, Kenya Physical Class Online Class
08/03/2027 - 12/03/2027 $1500 Nairobi, Kenya Physical Class Online Class
08/03/2027 - 12/03/2027 $2500 Kigali, Rwanda Physical Class Online Class
08/03/2027 - 12/03/2027 $5000 Dubai, UAE Physical Class Online Class
15/03/2027 - 19/03/2027 $2000 Mombasa, Kenya Physical Class Online Class
15/03/2027 - 19/03/2027 $5000 Singapore, Singapore Physical Class Online Class
15/03/2027 - 19/03/2027 $6000 Mauritius Physical Class Online Class
15/03/2027 - 19/03/2027 $1500 Nairobi, Kenya Physical Class Online Class
22/03/2027 - 26/03/2027 $6000 Mauritius Physical Class Online Class
22/03/2027 - 26/03/2027 $1500 Nairobi, Kenya Physical Class Online Class
22/03/2027 - 26/03/2027 $5000 Dubai, UAE Physical Class Online Class
22/03/2027 - 26/03/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
22/03/2027 - 26/03/2027 $4000 Johannesburg, South Africa Physical Class Online Class
22/03/2027 - 26/03/2027 $2500 Kigali, Rwanda Physical Class Online Class
29/03/2027 - 02/04/2027 $4500 Pretoria, South Africa Physical Class Online Class
29/03/2027 - 02/04/2027 $1500 Nairobi, Kenya Physical Class Online Class
05/04/2027 - 09/04/2027 $5000 Singapore, Singapore Physical Class Online Class
05/04/2027 - 09/04/2027 $1500 Nairobi, Kenya Physical Class Online Class
12/04/2027 - 16/04/2027 $5000 Dubai, UAE Physical Class Online Class
12/04/2027 - 16/04/2027 $2000 Mombasa, Kenya Physical Class Online Class
12/04/2027 - 16/04/2027 $1500 Nairobi, Kenya Physical Class Online Class
19/04/2027 - 23/04/2027 $4500 Pretoria, South Africa Physical Class Online Class
19/04/2027 - 23/04/2027 $5000 Singapore, Singapore Physical Class Online Class
19/04/2027 - 23/04/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
19/04/2027 - 23/04/2027 $1500 Nairobi, Kenya Physical Class Online Class
19/04/2027 - 23/04/2027 $4000 Johannesburg, South Africa Physical Class Online Class
26/04/2027 - 30/04/2027 $1500 Nairobi, Kenya Physical Class Online Class
03/05/2027 - 07/05/2027 $2500 Kigali, Rwanda Physical Class Online Class
03/05/2027 - 07/05/2027 $6000 Mauritius Physical Class Online Class
03/05/2027 - 07/05/2027 $1500 Nairobi, Kenya Physical Class Online Class
03/05/2027 - 07/05/2027 $2000 Mombasa, Kenya Physical Class Online Class
03/05/2027 - 07/05/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
10/05/2027 - 14/05/2027 $1500 Nairobi, Kenya Physical Class Online Class
10/05/2027 - 14/05/2027 $5000 Dubai, UAE Physical Class Online Class
17/05/2027 - 21/05/2027 $4000 Johannesburg, South Africa Physical Class Online Class
17/05/2027 - 21/05/2027 $2500 Kigali, Rwanda Physical Class Online Class
17/05/2027 - 21/05/2027 $4500 Pretoria, South Africa Physical Class Online Class
17/05/2027 - 21/05/2027 $1500 Nairobi, Kenya Physical Class Online Class
17/05/2027 - 21/05/2027 $5000 Singapore, Singapore Physical Class Online Class
24/05/2027 - 28/05/2027 $6000 Mauritius Physical Class Online Class
24/05/2027 - 28/05/2027 $2000 Mombasa, Kenya Physical Class Online Class
24/05/2027 - 28/05/2027 $1500 Nairobi, Kenya Physical Class Online Class
31/05/2027 - 04/06/2027 $1500 Nairobi, Kenya Physical Class Online Class
31/05/2027 - 04/06/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
31/05/2027 - 04/06/2027 $5000 Dubai, UAE Physical Class Online Class
31/05/2027 - 04/06/2027 $4500 Pretoria, South Africa Physical Class Online Class
07/06/2027 - 11/06/2027 $1500 Nairobi, Kenya Physical Class Online Class
07/06/2027 - 11/06/2027 $4000 Johannesburg, South Africa Physical Class Online Class
07/06/2027 - 11/06/2027 $6000 Mauritius Physical Class Online Class
14/06/2027 - 18/06/2027 $1500 Nairobi, Kenya Physical Class Online Class
14/06/2027 - 18/06/2027 $2500 Kigali, Rwanda Physical Class Online Class
14/06/2027 - 18/06/2027 $2000 Mombasa, Kenya Physical Class Online Class
14/06/2027 - 18/06/2027 $5000 Singapore, Singapore Physical Class Online Class
21/06/2027 - 25/06/2027 $1500 Nairobi, Kenya Physical Class Online Class
28/06/2027 - 02/07/2027 $5000 Singapore, Singapore Physical Class Online Class
28/06/2027 - 02/07/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
28/06/2027 - 02/07/2027 $2500 Kigali, Rwanda Physical Class Online Class
28/06/2027 - 02/07/2027 $1500 Nairobi, Kenya Physical Class Online Class
05/07/2027 - 09/07/2027 $6000 Mauritius Physical Class Online Class
05/07/2027 - 09/07/2027 $5000 Dubai, UAE Physical Class Online Class
05/07/2027 - 09/07/2027 $1500 Nairobi, Kenya Physical Class Online Class
12/07/2027 - 16/07/2027 $5000 Dubai, UAE Physical Class Online Class
12/07/2027 - 16/07/2027 $2000 Mombasa, Kenya Physical Class Online Class
12/07/2027 - 16/07/2027 $1500 Nairobi, Kenya Physical Class Online Class
12/07/2027 - 16/07/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
12/07/2027 - 16/07/2027 $4000 Johannesburg, South Africa Physical Class Online Class
12/07/2027 - 16/07/2027 $4500 Pretoria, South Africa Physical Class Online Class
19/07/2027 - 23/07/2027 $4500 Pretoria, South Africa Physical Class Online Class
19/07/2027 - 23/07/2027 $2000 Mombasa, Kenya Physical Class Online Class
19/07/2027 - 23/07/2027 $1500 Nairobi, Kenya Physical Class Online Class
19/07/2027 - 23/07/2027 $4000 Johannesburg, South Africa Physical Class Online Class
26/07/2027 - 30/07/2027 $5000 Singapore, Singapore Physical Class Online Class
26/07/2027 - 30/07/2027 $1500 Nairobi, Kenya Physical Class Online Class
26/07/2027 - 30/07/2027 $6000 Mauritius Physical Class Online Class
02/08/2027 - 06/08/2027 $1500 Nairobi, Kenya Physical Class Online Class
02/08/2027 - 06/08/2027 $2500 Kigali, Rwanda Physical Class Online Class
09/08/2027 - 13/08/2027 $4500 Pretoria, South Africa Physical Class Online Class
09/08/2027 - 13/08/2027 $1500 Nairobi, Kenya Physical Class Online Class
16/08/2027 - 20/08/2027 $1500 Nairobi, Kenya Physical Class Online Class
16/08/2027 - 20/08/2027 $5000 Dubai, UAE Physical Class Online Class
16/08/2027 - 20/08/2027 $2000 Mombasa, Kenya Physical Class Online Class
16/08/2027 - 20/08/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
23/08/2027 - 27/08/2027 $2500 Kigali, Rwanda Physical Class Online Class
23/08/2027 - 27/08/2027 $6000 Mauritius Physical Class Online Class
23/08/2027 - 27/08/2027 $1500 Nairobi, Kenya Physical Class Online Class
23/08/2027 - 27/08/2027 $5000 Singapore, Singapore Physical Class Online Class
23/08/2027 - 27/08/2027 $4000 Johannesburg, South Africa Physical Class Online Class
23/08/2027 - 27/08/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
30/08/2027 - 03/09/2027 $1500 Nairobi, Kenya Physical Class Online Class
30/08/2027 - 03/09/2027 $4500 Pretoria, South Africa Physical Class Online Class
30/08/2027 - 03/09/2027 $5000 Singapore, Singapore Physical Class Online Class
06/09/2027 - 10/09/2027 $4000 Johannesburg, South Africa Physical Class Online Class
06/09/2027 - 10/09/2027 $2500 Kigali, Rwanda Physical Class Online Class
06/09/2027 - 10/09/2027 $6000 Mauritius Physical Class Online Class
06/09/2027 - 10/09/2027 $5000 Dubai, UAE Physical Class Online Class
06/09/2027 - 10/09/2027 $1500 Nairobi, Kenya Physical Class Online Class
06/09/2027 - 10/09/2027 $2000 Mombasa, Kenya Physical Class Online Class
13/09/2027 - 17/09/2027 $2500 Dar es Salaam, Tanzania Physical Class Online Class
13/09/2027 - 17/09/2027 $5000 Dubai, UAE Physical Class Online Class
13/09/2027 - 17/09/2027 $1500 Nairobi, Kenya Physical Class Online Class
20/09/2027 - 24/09/2027 $1500 Nairobi, Kenya Physical Class Online Class
20/09/2027 - 24/09/2027 $4000 Johannesburg, South Africa Physical Class Online Class
20/09/2027 - 24/09/2027 $2000 Mombasa, Kenya Physical Class Online Class
20/09/2027 - 24/09/2027 $5000 Singapore, Singapore Physical Class Online Class
27/09/2027 - 01/10/2027 $4500 Pretoria, South Africa Physical Class Online Class
04/10/2027 - 08/10/2027 $2500 Kigali, Rwanda Physical Class Online Class
04/10/2027 - 08/10/2027 $6000 Mauritius Physical Class Online Class