Training course
Overview
Quantity Surveying Fundamentals
for Professionals is a comprehensive professional training course
designed to strengthen the technical, commercial, and practical capabilities of
professionals working in quantity surveying and construction cost management.
The course provides a structured understanding of quantity surveying across the
construction project lifecycle, covering measurement, estimating, bills of
quantities, cost planning, procurement, tendering, contract administration,
valuations, variations, cost control, claims, and final accounts. It is
designed to connect established quantity surveying principles with practical
workplace requirements and professional construction practices.
This quantity surveying
professional training course develops participants' ability to interpret
construction drawings and specifications, measure building and civil
engineering works, prepare quantities and bills of quantities, develop
construction rates, analyze project costs, and support procurement and
tendering activities. Participants are introduced to recognized measurement
principles, standard methods of measurement, FIDIC contract concepts,
professional ethics, cost-control frameworks, and structured commercial
procedures applicable to construction projects. Emphasis is placed on accuracy,
consistency, documentation, auditability, and effective communication of
commercial information.
The program uses practical tools
and professional techniques including dimension sheets, take-off schedules,
abstracting sheets, bills of quantities, rate-analysis templates, cost plans,
tender comparison statements, valuation sheets, variation registers, commercial
risk registers, cost-value reconciliation, cash-flow forecasts, and cost
reports. Participants work through realistic construction scenarios involving
incomplete information, changing quantities, tender clarifications, payment
applications, variations, subcontractor accounts, cost overruns, and commercial
risks. Excel-based quantity surveying workflows, digital measurement
approaches, BIM-based quantity take-off concepts, and data-driven cost
reporting are incorporated to support modern professional practice.
By completing Quantity
Surveying Fundamentals for Professionals, participants will be better
equipped to perform quantity surveying responsibilities throughout pre-contract
and post-contract stages while contributing effectively to project cost
certainty and commercial performance. The course progresses from foundational
measurement and estimating principles toward more advanced applications in contract
administration, cost forecasting, variations, claims, digital quantity
surveying, lifecycle costing, and commercial reporting. A comprehensive final
case study and capstone exercise integrate the knowledge and practical tools
developed throughout the training.
Course
Duration
10 Days (80 Hours)
Target
Participants
·
Quantity Surveyors and Assistant Quantity
Surveyors
·
Construction Cost Consultants and Cost Engineers
·
Junior and Intermediate Quantity Surveying
Professionals
·
Commercial Officers and Commercial
Administrators
·
Estimators and Tendering Professionals
·
Contract Administrators
·
Project Managers and Construction Managers
·
Civil, Structural, Architectural, and MEP
professionals involved in construction cost management
·
Contractor commercial and project-control
personnel
·
Procurement professionals working with
construction contracts and tenders
·
Professionals responsible for measurement,
valuations, cost reporting, variations, and final accounts
·
Built-environment professionals seeking
structured professional quantity surveying capability
Course
Objectives
By the end of the training,
participants will be able to:
·
Explain the role, responsibilities, and
professional functions of quantity surveyors throughout the construction project
lifecycle
·
Apply professional quantity surveying principles
to pre-contract and post-contract activities
·
Interpret architectural, structural, civil, and
MEP drawings and specifications for measurement and cost-management purposes
·
Apply recognized measurement principles and
standard methods of measurement to construction work
·
Prepare accurate quantity take-offs, dimension
sheets, squaring, abstracting, and bills of quantities
·
Develop preliminary estimates, detailed
estimates, unit rates, and resource-based rate analyses
·
Apply cost planning, cost checking,
benchmarking, value engineering, and budget-control techniques
·
Support procurement strategy, tender
documentation, tender analysis, and commercial evaluation
·
Prepare tender comparison statements and identify
pricing qualifications, exclusions, and abnormal rates
·
Understand key principles of construction
contracts and FIDIC-based contract administration
·
Prepare interim valuations, payment
applications, valuation certificates, and supporting commercial records
·
Manage variations, provisional sums, prime cost
items, dayworks, and other changes to contract value
·
Establish effective cost-control systems using
budgets, commitments, actual costs, forecasts, and cost-value reconciliation
·
Develop project cash-flow forecasts,
cost-to-complete assessments, and final-cost projections
·
Identify and document commercial risks, claims,
delays, disruption, and potential cost impacts
·
Apply practical Excel, digital measurement, BIM,
and data-analysis tools to quantity surveying activities
·
Perform subcontractor measurement, valuation,
payment assessment, and commercial reconciliation
·
Apply whole-life costing, sustainability
considerations, and lifecycle value principles to construction decisions
·
Prepare professional quantity surveying reports,
dashboards, commercial records, and management information
·
Complete final measurement, final accounts,
commercial closeout, and integrated quantity surveying assignments
Course
Content
Day
1: Quantity Surveying Foundations, Construction Economics, and Professional
Practice
Module 1: Quantity Surveying Foundations,
Construction Economics, and Professional Practice
1. Introduction
to Quantity Surveying — examine the purpose, scope, responsibilities,
competencies, and contribution of quantity surveyors to construction project
cost and commercial management.
2. Quantity
Surveying Across the Project Lifecycle — examine feasibility, concept design,
design development, procurement, tendering, construction, completion, defects
liability, and final-account stages.
3. Roles
in the Construction Project Team — understand the responsibilities and
interfaces of clients, architects, engineers, quantity surveyors, project
managers, contractors, subcontractors, suppliers, and consultants.
4. Construction
Economics and Cost Drivers — examine labour, materials, plant, preliminaries,
overheads, productivity, inflation, market conditions, logistics, project
duration, risk, and design complexity as construction cost drivers.
5. Construction
Cost Classification — distinguish direct costs, indirect costs, fixed costs,
variable costs, preliminaries, overheads, profit, contingencies, allowances,
and other commercial components.
6. Client
Requirements, Scope, and Cost Objectives — translate project requirements into
measurable scope, deliverables, assumptions, exclusions, budgets, cost targets,
and cost-management objectives.
7. Professional
Ethics and Quantity Surveying Standards — examine professional conduct,
confidentiality, competence, transparency, conflicts of interest, commercial
integrity, professional accountability, and quality of advice.
8. Construction
Documents and Information Control — interpret drawings, specifications,
schedules, contracts, addenda, revisions, instructions, RFIs, and other
information used in quantity surveying.
9. Case
Study: Quantity Surveyor's Role in a Construction Project — analyze a realistic
project from feasibility to construction and identify the quantity surveyor's
responsibilities, deliverables, risks, and decision points.
10. Exercise:
Professional Quantity Surveying Project Diagnostic — map a simulated project
lifecycle, identify required QS outputs, classify project costs, and establish
initial cost-management priorities.
Day
2: Construction Drawings, Measurement Principles, and Quantity Take-Off
Module 2: Construction Drawings,
Measurement Principles, and Quantity Take-Off
1. Reading
Architectural Drawings for Measurement — interpret plans, elevations, sections,
schedules, details, dimensions, room data, and architectural specifications for
quantity extraction.
2. Reading
Structural and Civil Drawings — interpret foundation layouts, structural
framing, reinforcement details, earthworks, roads, drainage, utilities, and
civil engineering information.
3. Reading
MEP Drawings and Specifications — identify quantities and scope from
mechanical, electrical, plumbing, fire protection, HVAC, and specialist-service
documentation.
4. Measurement
Principles and Units — apply appropriate units, descriptions, dimensions,
deductions, rules of measurement, accuracy requirements, and consistent
measurement conventions.
5. Standard
Methods of Measurement — examine recognized measurement frameworks and their
application to building, civil engineering, structural, and services work.
6. Quantity
Take-Off Procedures — establish systematic take-off workflows from drawings and
specifications while controlling assumptions, omissions, duplication, and
measurement errors.
7. Dimension
Sheets and Squaring — prepare dimension sheets, calculate extensions, square
measured quantities, check arithmetic, and maintain transparent measurement
records.
8. Measurement
of Major Construction Elements — measure excavation, filling, foundations,
concrete, reinforcement, formwork, masonry, structural steel, roofing,
finishes, and external works.
9. Measurement
of MEP and Specialist Works — develop quantities for plumbing, drainage,
electrical installations, HVAC, fire systems, vertical transportation, and
other specialist services.
10. Practical
Exercise: Complete Quantity Take-Off — measure selected elements from a
realistic drawing package, prepare dimension sheets, perform quantity checks,
and document measurement assumptions.
Day
3: Bills of Quantities, Estimating, Rate Analysis, and Cost Planning
Module 3: Bills of Quantities, Estimating,
Rate Analysis, and Cost Planning
1. Purpose
and Structure of Bills of Quantities — understand how BOQs communicate scope,
quantities, units, descriptions, pricing requirements, and commercial information.
2. BOQ
Work Sections and Item Descriptions — structure preliminaries, preambles,
measured works, provisional sums, prime cost items, dayworks, and other BOQ
components.
3. Preparing
and Abstracting Quantities — transfer measured quantities into abstract sheets
and organize information into logical trade and work sections.
4. Preliminary
and Order-of-Cost Estimating — apply early-stage estimating methods using floor
areas, functional units, elemental costs, historical data, benchmarks, and
project information.
5. Detailed
Estimating Techniques — develop estimates from measured quantities, resource
requirements, supplier quotations, subcontractor pricing, and project-specific
assumptions.
6. Construction
Rate Analysis — build unit rates from labour, materials, plant, productivity,
wastage, transportation, overheads, risk, and profit.
7. Labour,
Material, and Plant Productivity — assess production rates, crew composition,
material consumption, equipment utilization, wastage, and site conditions
affecting rates.
8. Cost
Planning and Cost Checks — prepare cost plans, elemental analyses, cost checks,
budget comparisons, and variance explanations throughout design development.
9. Benchmarking
and Historical Cost Data — apply historical project data, cost indices,
location factors, market information, and normalized benchmarks to improve
estimating reliability.
10. Exercise:
BOQ and Rate Analysis Workshop — prepare selected BOQ sections, develop
resource-based rates, compare estimated costs with a target budget, and
identify major cost drivers.
Day
4: Value Management, Procurement, and Tender Documentation
Module 4: Value Management, Procurement,
and Tender Documentation
1. Principles
of Cost Planning — establish cost targets, design-stage cost controls,
elemental budgets, allowances, and formal cost-review points.
2. Value
Engineering and Value Management — apply functional analysis and alternative
solutions to improve value while maintaining required performance, quality,
safety, and functionality.
3. Lifecycle
Cost Considerations — compare initial capital expenditure with operating,
maintenance, replacement, energy, and disposal costs when evaluating
alternatives.
4. Construction
Procurement Methods — examine traditional procurement, design-and-build, EPC,
management contracting, construction management, framework arrangements, and
other delivery approaches.
5. Procurement
Strategy and Risk Allocation — evaluate scope maturity, programme, market
capacity, design responsibility, price certainty, risk allocation, and client
objectives.
6. Tender
Packaging and Scope Definition — structure procurement packages, interfaces,
responsibilities, deliverables, quantities, and commercial boundaries.
7. Tender
Documentation — prepare bills of quantities, schedules of works, preliminaries,
specifications, pricing schedules, instructions to tenderers, and commercial
requirements.
8. Tender
Queries, Clarifications, and Addenda — manage bidder questions, clarification
registers, revised information, commercial responses, and tender-period
document control.
9. Case
Study: Procurement and Value Engineering — evaluate alternative procurement
approaches and cost-saving proposals for a commercial building while
considering scope, quality, risk, and lifecycle implications.
10. Exercise:
Tender Package Preparation — develop a structured tender package containing BOQ
requirements, pricing schedules, commercial instructions, assumptions,
exclusions, and a tender clarification log.
Day
5: Tendering, Bid Evaluation, Contract Formation, and Commercial Risk
Module 5: Tendering, Bid Evaluation,
Contract Formation, and Commercial Risk
1. Tender
Receipt and Compliance Checking — verify tender completeness, required
schedules, signatures, securities, pricing documents, qualifications,
exclusions, and submission requirements.
2. Tender
Arithmetic and Commercial Review — identify calculation errors,
inconsistencies, omissions, pricing anomalies, and discrepancies between tender
documents.
3. Tender
Comparison and Normalization — compare competing tenders by adjusting for
qualifications, exclusions, provisional items, assumptions, discounts, and
other commercial differences.
4. Analysis
of Tender Rates — assess labour, material, plant, preliminaries, overheads,
profit, provisional sums, and other pricing components to understand bidder pricing
strategies.
5. Abnormal
and Unbalanced Pricing — identify front-loading, back-loading, unrealistic
rates, distorted quantities, unusually high or low items, and potential
commercial exposure.
6. Contractor
Commercial Capability — examine financial capacity, relevant experience,
resources, bonding, insurance, subcontracting arrangements, and other
commercial considerations.
7. Tender
Clarification and Negotiation — conduct structured clarification meetings,
record responses, evaluate revised pricing, and maintain an auditable
procurement trail.
8. Contract
Formation and Pre-Award Controls — confirm scope, contract sum, programme,
payment provisions, securities, insurance, variations, and other commercial
conditions before award.
9. Commercial
Risk Register Development — identify tender, procurement, pricing,
supply-chain, design, programme, payment, and contractual risks and assign
appropriate controls.
10. Case Study:
Tender Evaluation and Recommendation — analyze several simulated bids,
normalize commercial differences, investigate abnormal pricing, assess risks,
and prepare a professional tender evaluation statement.
Day
6: Contract Administration, Valuations, Payments, and Cost Control
Module 6: Contract Administration,
Valuations, Payments, and Cost Control
1. Post-Contract
Quantity Surveying Responsibilities — establish the QS role after contract
award and connect the contract sum, BOQ, cost codes, commitments, valuations,
and forecasts.
2. Construction
Contract Administration Principles — examine contract documents, instructions,
notices, approvals, correspondence, records, and commercial responsibilities.
3. FIDIC
Contract Concepts for Quantity Surveyors — examine commonly encountered
principles relating to contract documents, payment, variations, notices,
claims, extensions of time, and records.
4. Interim
Valuation Procedures — measure completed work, assess contract rates, approved
variations, materials on site, retention, deductions, advances, and other
payment components.
5. Payment
Applications and Certification — review contractor applications, supporting
records, valuation calculations, certification requirements, and
payment-control procedures.
6. Materials
on Site and Stored Materials — assess eligibility, ownership, inspection,
documentation, storage, insurance, traceability, and valuation requirements.
7. Retention,
Advance Payment, Bonds, and Deductions — calculate and monitor contractual
deductions, recovery mechanisms, securities, retention, and release
requirements.
8. Cost
Coding and Commitment Control — establish cost codes linking contracts,
purchase orders, subcontracts, commitments, actual expenditure, variations, and
forecasts.
9. Cost-Value
Reconciliation and Forecasting — compare budget, committed cost, actual cost,
certified value, cost-to-complete, and forecast final cost.
10. Exercise:
Interim Valuation and Cost Report — prepare an interim valuation, update a cost
report, perform a cost-value reconciliation, and identify corrective actions
for emerging variances.
Day
7: Variations, Claims, Delays, Subcontractors, and Commercial Management
Module 7: Variations, Claims, Delays,
Subcontractors, and Commercial Management
1. Change
and Variation Management — establish procedures for identifying, documenting,
pricing, approving, tracking, and closing variations.
2. Variation
Pricing and Valuation — apply contract rates, derived rates, new rates,
quotations, resource-based analysis, and daywork principles to changed work.
3. Provisional
Sums and Prime Cost Items — administer allowances and specialist commercial
items while maintaining accurate records and transparent valuation.
4. Subcontract
Measurement and Valuation — measure subcontract works, assess applications,
review variations, manage retention, and reconcile subcontract accounts.
5. Delay
and Extension-of-Time Concepts — understand relationships among programme
delay, time-related costs, preliminaries, resources, and contractual
entitlement.
6. Disruption
and Productivity Impacts — examine loss of productivity, resequencing, access
restrictions, changes, interference, and other factors affecting construction
performance and cost.
7. Claims
Identification and Documentation — establish workflows for identifying
entitlement, notification, causation, quantum, supporting evidence, and
commercial assessment.
8. Contemporary
Records and Evidence — maintain site diaries, instructions, correspondence,
labour returns, plant records, delivery notes, photographs, programmes,
progress reports, and other evidence.
9. Commercial
Dispute Avoidance — examine negotiation, structured commercial meetings,
mediation, adjudication, arbitration, and other recognized dispute-management
approaches.
10. Case Study:
Variation and Delay Assessment — analyze a realistic project involving design
changes and delayed information, calculate potential commercial impacts, and
prepare a structured assessment.
Day
8: Project Cost Control, Excel, Digital Quantity Surveying, and BIM
Module 8: Project Cost Control, Excel,
Digital Quantity Surveying, and BIM
1. Construction
Cost-Control Frameworks — integrate approved budgets, commitments, actual
expenditure, certified value, variations, forecasts, and final-cost
projections.
2. Cost
Codes and Cost Breakdown Structures — develop logical cost structures for work
packages, trades, procurement packages, subcontractors, and project overheads.
3. Cost
Variance and Trend Analysis — calculate cost variances, investigate causes,
identify trends, and develop corrective-action plans.
4. Cash-Flow
Forecasting — prepare time-phased cash-flow forecasts incorporating planned
expenditure, procurement commitments, valuations, payment timing, retention,
and projected final costs.
5. Excel
for Quantity Surveying — develop practical spreadsheets for measurement, rate
analysis, BOQs, tender comparisons, valuations, variations, cost reports, and
cash flow.
6. Digital
Measurement and Estimating Tools — examine electronic take-off, cost databases,
digital measurement workflows, document management, and data-validation
practices.
7. BIM-Based
Quantity Take-Off — understand how quantities can be extracted from coordinated
BIM models and how model quality, classification, information maturity, and
measurement rules affect results.
8. 4D
and 5D BIM Concepts — connect construction quantities, costs, and programme
information to support cost-loaded models, change management, forecasting, and
visualization.
9. Commercial
Dashboards and Data Analytics — use key performance indicators, trend analysis,
cost breakdowns, exception reporting, and management dashboards to communicate
project financial performance.
10. Practical
Exercise: Digital Cost-Control Workflow — develop an Excel-based cost-control
model and integrate measurement, budget, commitments, actuals, forecast costs,
variations, and management reporting.
Day
9: Advanced Cost Management, Risk, Sustainability, and Lifecycle Economics
Module 9: Advanced Cost Management, Risk,
Sustainability, and Lifecycle Economics
1. Advanced
Cost Forecasting — develop cost-to-complete and estimate-at-completion
forecasts using current project performance, remaining quantities, commitments,
productivity, and commercial risks.
2. Cost
Risk and Sensitivity Analysis — assess how changes in quantities, rates,
productivity, inflation, programme, procurement, and risk allowances affect
final project cost.
3. Scenario
Planning for Construction Costs — develop alternative cost scenarios for
changes in scope, market conditions, programme, supply-chain availability, and
project delivery strategy.
4. Inflation,
Escalation, and Market Volatility — examine material-price changes, labour
escalation, energy costs, logistics, currency exposure, and supply-chain
pressures affecting project budgets.
5. Whole-Life
Costing — evaluate capital, operating, maintenance, replacement, energy,
disposal, and residual-value costs over an asset lifecycle.
6. Sustainability
and Construction Cost Management — incorporate energy efficiency, water
conservation, low-carbon materials, waste reduction, renewable technologies,
and circular-economy principles into commercial analysis.
7. Lifecycle
Value Engineering — compare alternatives using initial cost, operating
performance, durability, maintenance requirements, replacement cycles, risk,
and long-term value.
8. Supply-Chain
and Procurement Risk — evaluate supplier concentration, long-lead materials,
logistics constraints, market capacity, alternative sourcing, and procurement
contingencies.
9. Case
Study: Lifecycle Cost and Sustainable Investment — compare alternative
construction solutions using capital cost, operational cost, maintenance, energy
performance, environmental objectives, and risk.
10. Exercise:
Advanced Cost Forecasting and Risk Analysis — prepare a multi-scenario
forecast, perform sensitivity analysis, identify major commercial exposures,
and present an evidence-based cost-management plan.
Day
10: Final Accounts, Professional Reporting, Commercial Closeout, and Capstone
Module 10: Final Accounts, Professional
Reporting, Commercial Closeout, and Capstone
1. Final
Measurement Principles — complete final measurement of contract works and
reconcile actual quantities against original BOQ quantities and approved
changes.
2. Final
Account Preparation — compile contract value, variations, provisional sums,
dayworks, claims, adjustments, deductions, and other commercial components into
a final account.
3. Subcontract
Final Account Reconciliation — review subcontract measurements, valuations,
variations, claims, deductions, retention, payments, and outstanding commercial
matters.
4. Final
Account Negotiation and Settlement — apply structured negotiation, evidence
review, commercial analysis, agreement documentation, and settlement
procedures.
5. Completion,
Defects, and Commercial Closeout — coordinate completion documentation,
defects-liability requirements, outstanding works, warranties, and financial
closeout.
6. Release
of Retention and Securities — review completion conditions and prepare
commercial records supporting release of retention, bonds, guarantees, and
other securities.
7. Final
Cost Reporting and Lessons Learned — compare original budget, tendered amount,
contract value, changes, actual expenditure, final account, and major
commercial lessons.
8. Professional
Quantity Surveying Reports — prepare concise cost reports, valuation summaries,
commercial dashboards, risk reports, tender evaluations, and management
recommendations.
9. Integrated
Case Study: End-to-End Quantity Surveying Assignment — manage a simulated
construction project from measurement and tendering through valuation,
variations, cost control, claims, forecasting, final measurement, and closeout.
10. Capstone
Exercise: Professional Quantity Surveying Project Portfolio — complete and
present an integrated portfolio covering quantity take-off, BOQ preparation,
estimating, rate analysis, tender evaluation, contract administration, interim
valuation, variation assessment, cost reporting, risk analysis, final account,
and commercial recommendations.


