Training course
Overview
Advanced Quantity Surveying
Fundamentals is a comprehensive professional training course designed
to develop advanced knowledge and practical capability in quantity surveying,
construction cost management, measurement, estimating, procurement, tendering,
contract administration, commercial management, and project financial control.
The course builds on fundamental quantity surveying principles and progresses
toward advanced techniques used to manage complex construction projects, with
emphasis on accurate measurement, cost planning, bills of quantities, rate
analysis, valuation, variations, claims, forecasting, and commercial
decision-making.
This advanced quantity surveying
training course provides participants with structured exposure to professional
measurement standards, construction documentation, cost estimating
methodologies, procurement strategies, tender evaluation, contract
administration, and project cost control. Participants examine practical
applications of standard methods of measurement, FIDIC contract concepts, cost
reporting frameworks, risk registers, value engineering, lifecycle costing, and
commercial management practices while learning how to interpret architectural,
structural, civil, and MEP information for sophisticated quantity surveying
assignments.
The course emphasizes practical
quantity surveying skills through worked examples, measurement exercises,
tender analysis, rate-building activities, interim valuation scenarios,
variation assessments, claims analysis, cost forecasting, and commercial case
studies. Participants use practical tools such as dimension sheets, take-off
schedules, bills of quantities, tender comparison statements, cost-value
reconciliation, cash-flow forecasts, commercial dashboards, Excel-based cost
models, risk registers, and BIM-enabled quantity take-off workflows to
strengthen accuracy, transparency, auditability, and professional reporting.
By combining advanced technical
measurement with strategic commercial thinking, Advanced Quantity
Surveying Fundamentals equips quantity surveyors, construction
professionals, project managers, commercial managers, consultants, contractors,
and other built-environment professionals to improve cost certainty and
commercial performance across the project lifecycle. The program also addresses
emerging practices including BIM and 5D cost management, digital measurement,
data analytics, sustainability costing, lifecycle economics, supply-chain risk,
cost intelligence, and advanced forecasting, culminating in an integrated
quantity surveying capstone based on a realistic construction project scenario.
Course
Duration
10 Days (80 Hours)
Target
Participants
·
Quantity Surveyors seeking advanced technical
and commercial capability
·
Senior Quantity Surveyors and Assistant Quantity
Surveyors
·
Cost Consultants and Construction Cost Engineers
·
Commercial Managers and Commercial Officers
·
Project Managers and Construction Managers
·
Contracts and Procurement Professionals
·
Estimators and Tendering Specialists
·
Contractor Commercial and Cost-Control Personnel
·
Civil, Structural, Architectural, and MEP
professionals involved in project costing
·
Professionals responsible for construction
budgets, valuations, variations, claims, and final accounts
·
Built-environment professionals seeking advanced
quantity surveying knowledge
Course
Objectives
By the end of the training,
participants will be able to:
·
Apply advanced quantity surveying principles
across the full construction project lifecycle
·
Interpret complex architectural, structural,
civil, and MEP drawings and specifications for measurement purposes
·
Apply recognized measurement principles and
standard methods of measurement consistently
·
Prepare accurate advanced quantity take-offs,
dimension sheets, abstracts, and bills of quantities
·
Develop detailed estimates, unit rates,
resource-based rate analyses, and cost plans
·
Apply advanced cost planning, benchmarking,
value engineering, and lifecycle-costing techniques
·
Develop procurement and tender strategies
aligned with project risk, scope, cost, and delivery requirements
·
Evaluate tenders using structured technical,
commercial, compliance, and risk-based approaches
·
Administer construction contracts and manage
valuations, payments, variations, and commercial records
·
Apply FIDIC concepts and other recognized
contract-administration principles to quantity surveying practice
·
Analyze variations, delay, disruption,
acceleration, extension-of-time, and claims-related cost impacts
·
Establish effective project cost-control systems
using budgets, commitments, actual costs, forecasts, and cost-value
reconciliation
·
Prepare advanced cash-flow forecasts,
cost-to-complete assessments, and estimate-at-completion projections
·
Use Excel, digital measurement tools, BIM, 5D
workflows, and commercial dashboards for quantity surveying analysis
·
Apply risk analysis, sensitivity analysis,
scenario planning, and supply-chain considerations to construction cost
management
·
Integrate sustainability, lifecycle economics,
energy performance, and whole-life cost considerations into commercial
decisions
·
Manage subcontractor measurement, valuation,
commercial administration, and account reconciliation
·
Prepare professional commercial reports,
management dashboards, and evidence-based recommendations
·
Conduct final measurement, final account
settlement, commercial closeout, and lessons-learned reviews
·
Integrate advanced quantity surveying techniques
through a comprehensive real-world project capstone
Course
Content
Day
1: Advanced Quantity Surveying Practice, Construction Economics, and
Professional Standards
Module 1: Advanced Quantity Surveying
Practice, Construction Economics, and Professional Standards
1. Advanced
Quantity Surveying Role and Project Lifecycle — examine the evolving role of
the quantity surveyor across feasibility, design, procurement, construction,
completion, and post-contract administration, with emphasis on advanced
commercial responsibilities.
2. Construction
Economics and Advanced Cost Drivers — analyze labour, materials, plant,
preliminaries, overheads, financing, inflation, market conditions,
productivity, logistics, risk, and project complexity as drivers of
construction cost.
3. Advanced
Cost Classification and Cost Structure — distinguish direct and indirect costs,
fixed and variable costs, preliminaries, overhead recovery, profit, contingencies,
risk allowances, provisional sums, and other commercial cost components.
4. Professional
Ethics, Competence, and Commercial Integrity — apply principles of professional
conduct, confidentiality, independence, transparency, competence,
conflict-of-interest management, accurate reporting, and responsible commercial
advice.
5. Construction
Documentation and Information Management — interpret drawings, specifications,
schedules, employer requirements, addenda, technical submissions, revisions,
RFIs, instructions, and other project information used in commercial
management.
6. Advanced
Scope Definition and Cost Objectives — translate client requirements into
measurable scope, cost objectives, deliverables, assumptions, exclusions,
allowances, and cost-management parameters.
7. Cost
Risk and Commercial Uncertainty — introduce commercial risk registers,
probability and consequence assessment, risk allowances, sensitivity analysis,
contingency principles, and risk ownership.
8. International
Standards and Quantity Surveying Frameworks — examine the application of
recognized measurement standards, professional guidance, FIDIC concepts,
ISO-based management principles, and project-specific measurement requirements.
9. Case
Study: Cost Management of a Complex Construction Project — analyze a
multi-disciplinary project with incomplete information, changing requirements,
market volatility, and competing cost objectives to identify appropriate
quantity surveying interventions.
10. Exercise:
Advanced QS Professional Practice Diagnostic — complete a structured assessment
of project information, cost risks, professional responsibilities, assumptions,
and required quantity surveying deliverables for a simulated project.
Day
2: Advanced Measurement, Quantity Take-Off, and Bills of Quantities
Module 2: Advanced Measurement, Quantity
Take-Off, and Bills of Quantities
1. Advanced
Measurement Principles and Rules — apply consistent measurement procedures,
units, descriptions, dimensions, deductions, waste considerations, and
measurement conventions to complex construction work.
2. Standard
Methods of Measurement in Advanced Practice — compare and apply relevant
standard measurement approaches and project-specific rules when preparing
quantities for different construction disciplines.
3. Advanced
Drawing Interpretation for Measurement — interpret coordinated architectural,
structural, civil, mechanical, electrical, plumbing, and specialist-service
drawings for comprehensive quantity extraction.
4. Complex
Quantity Take-Off Techniques — measure irregular geometry, composite
assemblies, repetitive elements, openings, interfaces, temporary works, and
complex construction components.
5. Dimension
Sheets, Squaring, and Abstracting — prepare organized dimension sheets,
calculate extensions, square quantities, abstract measured work, and maintain
transparent measurement audit trails.
6. Measurement
of Earthworks, Foundations, and Structural Works — undertake advanced
measurement of excavation, disposal, filling, piling, ground improvement,
foundations, concrete, reinforcement, formwork, steelwork, and structural
assemblies.
7. Measurement
of Building Fabric and Finishes — measure masonry, partitions, façades,
roofing, waterproofing, insulation, doors, windows, floor finishes, wall
finishes, ceilings, painting, and specialist finishes.
8. Measurement
of Civil and MEP Works — develop quantities for roads, drainage, utilities,
external works, plumbing, HVAC, electrical installations, fire systems, and
other building services.
9. Advanced
Bills of Quantities Structure — develop work sections, preliminaries,
preambles, measured works, provisional items, prime cost items, dayworks,
schedules, and pricing mechanisms.
10. Practical
Exercise: Advanced Quantity Take-Off and BOQ Preparation — complete a
coordinated measurement exercise from a multi-discipline drawing package and
produce an auditable quantity schedule and selected BOQ sections.
Day
3: Advanced Estimating, Rate Analysis, Cost Planning, and Value Engineering
Module 3: Advanced Estimating, Rate
Analysis, Cost Planning, and Value Engineering
1. Advanced
Estimating Methodologies — apply preliminary estimating, elemental estimating,
approximate quantities, resource-based estimating, historical-cost analysis,
and detailed estimating approaches.
2. Advanced
Unit Rate Development — construct rates using labour, material, plant,
subcontractor, wastage, productivity, logistics, overhead, risk, and profit
components.
3. Labour
Productivity and Resource-Based Cost Analysis — evaluate productivity
assumptions, crew compositions, production rates, working conditions, learning
effects, and site constraints when developing construction rates.
4. Material
and Plant Cost Analysis — assess supplier quotations, equipment ownership and
operating costs, transportation, storage, wastage, escalation, utilization,
depreciation, and downtime.
5. Preliminaries
and Project Overhead Analysis — develop project-specific preliminaries and
assess site establishment, temporary facilities, supervision, security,
utilities, logistics, insurance, testing, and management costs.
6. Cost
Planning and Elemental Cost Analysis — prepare elemental cost plans, cost
checks, benchmarks, variance analyses, design-stage estimates, and cost
targets.
7. Cost
Benchmarking and Historical Cost Intelligence — use normalized historical data,
project comparables, cost indices, location factors, inflation adjustments, and
market intelligence to improve estimate reliability.
8. Value
Engineering and Value Management — apply functional analysis, target costing,
alternative design evaluation, lifecycle implications, constructability, and
value-improvement techniques without compromising required performance.
9. Case
Study: Cost Reduction Without Loss of Function — evaluate alternative
materials, construction methods, specifications, procurement approaches, and
design solutions to identify measurable value opportunities.
10. Exercise:
Advanced Estimate and Rate-Building Workshop — prepare detailed rates and a
cost plan for selected work packages, test assumptions through sensitivity analysis,
and present recommendations to a simulated client team.
Day
4: Strategic Cost Planning, Procurement, and Advanced Tender Documentation
Module 4: Strategic Cost Planning,
Procurement, and Advanced Tender Documentation
1. Advanced
Cost Planning Throughout Design Development — establish cost control points
from concept through detailed design and coordinate design development with
budget, scope, and affordability objectives.
2. Procurement
Strategy and Project Delivery Methods — evaluate traditional procurement,
design-and-build, EPC, management contracting, construction management,
framework arrangements, and collaborative delivery models.
3. Tender
Packaging and Work Breakdown for Procurement — structure procurement packages,
scopes, interfaces, responsibilities, deliverables, and commercial boundaries
to minimize gaps and overlaps.
4. Advanced
Tender Documentation — prepare pricing schedules, bills of quantities,
preliminaries, specifications, schedules of works, employer requirements,
instructions to tenderers, and commercial return requirements.
5. Tender
Information Quality and Commercial Completeness — establish document-control
procedures, revision management, tender assumptions, exclusions,
clarifications, addenda, and information release protocols.
6. Market
Testing and Supplier Engagement — analyze supplier quotations, market capacity,
long-lead materials, subcontractor availability, inflation exposure, and market
conditions affecting tender pricing.
7. Procurement
Risk and Commercial Strategy — develop procurement risk registers covering
price volatility, supplier failure, design maturity, logistics, interfaces,
foreign exchange, lead times, and contractual allocation.
8. Tender
Clarifications, Queries, and Addenda — manage bidder questions, clarification
logs, commercial responses, issued addenda, and equal-treatment principles
during the tender period.
9. Case
Study: Procurement Strategy for a Complex Project — select and structure an
appropriate procurement approach for a technically complex project with tight
deadlines, specialist subcontractors, and significant commercial risks.
10. Exercise:
Tender Package Development — create a procurement package containing scope
information, BOQ requirements, pricing schedules, commercial instructions,
assumptions, and a tender clarification register.
Day
5: Advanced Tender Evaluation, Contract Formation, and Commercial Risk
Module 5: Advanced Tender Evaluation,
Contract Formation, and Commercial Risk
1. Tender
Receipt and Compliance Review — establish systematic procedures for checking tender
completeness, signatures, securities, schedules, qualifications, exclusions,
arithmetic, and mandatory submission requirements.
2. Advanced
Tender Analysis — compare rates, totals, preliminaries, provisional sums, unit
prices, discounts, qualifications, exclusions, and pricing patterns across
competing bids.
3. Tender
Comparison Statements — prepare structured commercial comparison statements and
identify material differences that require clarification before recommendation.
4. Abnormal
and Unbalanced Tender Pricing — identify front-loading, back-loading,
unrealistic rates, abnormal preliminaries, distorted quantities, and other
pricing patterns requiring commercial investigation.
5. Contractor
Financial and Commercial Capability — assess relevant financial information,
resources, experience, bonding capacity, insurance, cash-flow capability, and
commercial risk indicators.
6. Tender
Clarification and Negotiation — conduct structured commercial clarification,
negotiation, normalization, and recommendation processes while maintaining an
auditable procurement record.
7. Contract
Formation and Pre-Award Commercial Controls — coordinate agreed scope, price,
programme, securities, insurances, payment provisions, variations, provisional
items, and other commercial requirements before award.
8. FIDIC
and Recognized Contract Administration Concepts — examine key principles
relating to contract documents, notices, instructions, payment, variations,
claims, extensions of time, and records within commonly used contract
frameworks.
9. Commercial
Risk Allocation and Contract Strategy — evaluate how risk allocation affects
pricing, contingencies, insurance, allowances, responsibilities, and potential
future commercial exposure.
10. Case Study:
Competitive Tender Evaluation — perform a full commercial review of simulated
tenders, identify abnormal pricing and qualifications, normalize competing
bids, and prepare a professional tender evaluation report.
Day
6: Advanced Contract Administration, Valuations, Payments, and Cost Control
Module 6: Advanced Contract
Administration, Valuations, Payments, and Cost Control
1. Advanced
Post-Contract Quantity Surveying — establish commercial control procedures
after contract award and align the approved contract sum, BOQ, cost codes,
commitments, and project controls.
2. Contract
Documentation and Commercial Correspondence — manage instructions, notices,
approvals, RFIs, variation requests, payment records, meeting records, and
other evidence required for effective contract administration.
3. Interim
Valuations and Payment Applications — assess completed work, measured
quantities, contract rates, approved variations, materials on site, retention,
deductions, advances, and other payment components.
4. Measurement
of Progress and Valuation Evidence — establish reliable progress-measurement
procedures using site records, inspection evidence, quantity records,
photographs, schedules, and approved documentation.
5. Materials
on Site and Stored Materials — evaluate eligibility, ownership, insurance,
documentation, inspection, storage, traceability, and valuation requirements
for materials not yet incorporated into the works.
6. Retention,
Advance Payments, Bonds, and Deductions — calculate and monitor contractual
deductions, recovery mechanisms, securities, guarantees, retention balances,
and release conditions.
7. Cost
Coding and Commitment Control — develop cost codes and control structures that
link contracts, purchase orders, subcontracts, variations, actual expenditure,
forecasts, and approved budgets.
8. Cost-Value
Reconciliation — compare certified value, committed cost, actual expenditure,
forecast cost, and budget to identify commercial trends and emerging variances.
9. Advanced
Cost Reporting and Forecasting — prepare cost reports, committed-cost analyses,
cost-to-complete assessments, cash-flow projections, and estimate-at-completion
forecasts.
10. Exercise:
Interim Valuation and Cost Report — prepare an interim valuation, update a
project cost report, reconcile committed and actual costs, and develop
corrective actions for identified commercial variances.
Day
7: Advanced Variations, Claims, Delay, Disruption, and Commercial Risk
Management
Module 7: Advanced Variations, Claims,
Delay, Disruption, and Commercial Risk Management
1. Variation
Identification and Change-Control Systems — establish formal procedures for
identifying, documenting, pricing, approving, tracking, and closing
construction changes.
2. Variation
Pricing and Valuation — evaluate changes using contract rates, derived rates,
new rates, quotations, daywork principles, resource analysis, and demonstrable
cost evidence.
3. Provisional
Sums, Prime Cost Items, and Dayworks — administer allowances and specialist
commercial mechanisms while maintaining accurate records and transparent
valuation procedures.
4. Extension
of Time and Time-Related Cost — examine the relationship between programme
impacts, prolongation costs, preliminaries, resources, site overheads, and
contractual entitlement.
5. Delay
and Disruption Cost Assessment — distinguish delay, disruption, acceleration,
and productivity impacts and evaluate their potential commercial consequences
using appropriate project records.
6. Claims
Identification, Notification, and Substantiation — establish claim-management
workflows covering entitlement, causation, quantum, contractual notices,
contemporary records, and supporting evidence.
7. Contemporary
Records and Commercial Evidence — develop disciplined records involving site
diaries, instructions, correspondence, labour returns, plant records, delivery
notes, photographs, progress reports, and programme updates.
8. Commercial
Risk Registers and Early-Warning Systems — identify emerging commercial
threats, assign ownership, assess probability and consequence, and establish
mitigation and escalation mechanisms.
9. Dispute
Avoidance and Resolution — examine negotiation, structured commercial meetings,
mediation, adjudication, arbitration, litigation, and other recognized
dispute-management approaches.
10. Case Study:
Complex Variation and Delay Claim — analyze a simulated project involving
design changes, delayed information, productivity disruption, and additional
preliminaries, then prepare a structured commercial assessment.
Day
8: Advanced Cost Control, Digital Quantity Surveying, BIM, and Data Analytics
Module 8: Advanced Cost Control, Digital
Quantity Surveying, BIM, and Data Analytics
1. Advanced
Project Cost-Control Systems — integrate budgets, commitments, purchase orders,
subcontract values, actual expenditure, certified value, forecasts, and final
cost projections into a coherent control framework.
2. Cost
Variance and Trend Analysis — calculate and interpret cost variances, forecast
deviations, trend indicators, commercial exposure, and corrective-action
requirements.
3. Advanced
Cash-Flow Forecasting — develop time-phased cash-flow models covering planned
expenditure, certified value, payment timing, retention, procurement
commitments, and forecast final cost.
4. Estimate
at Completion and Cost-to-Complete Analysis — use project performance data and
remaining work forecasts to develop reliable final-cost projections and
scenario-based forecasts.
5. Excel
for Advanced Quantity Surveying — build structured workbooks for take-off, rate
analysis, BOQs, tender analysis, valuations, variations, cost reports, cash
flow, and final-account reconciliation.
6. Digital
Measurement and Estimating Platforms — examine digital take-off, electronic
measurement, estimating databases, cost libraries, document management, and
data-validation workflows.
7. BIM-Based
Quantity Take-Off — extract quantities from coordinated models, establish
measurement rules, validate model data, and identify limitations associated
with model maturity and information quality.
8. 4D
and 5D BIM for Cost Management — connect quantities, cost information, and
programme data to support cost-loaded models, change analysis, forecasting, and
commercial visualization.
9. Commercial
Dashboards and Data Analytics — develop management dashboards using key
performance indicators, trend charts, cost breakdowns, forecast indicators, and
exception reporting.
10. Practical
Exercise: Digital Quantity Surveying Workflow — develop a digital measurement
and cost-control workflow from model or drawing information through quantity
validation, rate application, cost reporting, and dashboard presentation.
Day
9: Advanced Cost Forecasting, Lifecycle Economics, Sustainability, and
Strategic Commercial Management
Module 9: Advanced Cost Forecasting,
Lifecycle Economics, Sustainability, and Strategic Commercial Management
1. Advanced
Cost Forecasting and Scenario Analysis — develop base, optimistic, and adverse
cost scenarios using assumptions concerning quantities, productivity,
escalation, programme, procurement, and risk.
2. Cost
Sensitivity and Monte Carlo Concepts — introduce sensitivity analysis,
probability distributions, uncertainty ranges, and quantitative risk concepts for
construction cost forecasting.
3. Inflation,
Escalation, and Market Volatility — assess material-price changes, labour
escalation, currency exposure, energy costs, supply-chain disruption, and
appropriate commercial responses.
4. Whole-Life
Costing and Total Cost of Ownership — compare capital expenditure, operating
expenditure, maintenance, replacement, energy, disposal, and residual-value
considerations over an asset lifecycle.
5. Sustainable
Construction Cost Management — incorporate energy efficiency, renewable
systems, water efficiency, waste reduction, low-carbon materials, circularity,
and environmental-performance requirements into cost analysis.
6. Lifecycle
Value Engineering — evaluate alternatives based on initial cost, operating
performance, durability, maintenance requirements, replacement cycles, risk,
and long-term value.
7. Supply
Chain and Procurement Resilience — assess supplier concentration, long-lead
items, logistics exposure, alternative sourcing, framework agreements,
strategic procurement, and contingency planning.
8. Advanced
Commercial Performance Management — establish KPIs for cost certainty,
procurement performance, variation exposure, claims, forecast accuracy, cash
flow, final-account status, and commercial risk.
9. Case
Study: Lifecycle Cost and Sustainability Investment — compare alternative
building or infrastructure solutions using capital cost, operating cost,
maintenance requirements, energy performance, risk, and lifecycle value.
10. Exercise:
Strategic Cost Forecasting and Investment Appraisal — prepare a multi-scenario
cost forecast and lifecycle comparison, identify key sensitivities, and present
evidence-based commercial recommendations to senior stakeholders.
Day
10: Final Accounts, Commercial Closeout, Strategic Reporting, and Integrated
Capstone
Module 10: Final Accounts, Commercial
Closeout, Strategic Reporting, and Integrated Capstone
1. Final
Measurement and Reconciliation — complete final measurement, reconcile measured
quantities with contract quantities, and identify outstanding changes,
omissions, and adjustments.
2. Final
Account Preparation — compile contract value, approved variations, provisional
sums, dayworks, claims, adjustments, deductions, and other commercial
components into a comprehensive final account.
3. Subcontract
Final Accounts and Commercial Reconciliation — review subcontractor
measurements, valuations, variations, claims, contra charges, retention,
payment records, and account settlements.
4. Final
Account Negotiation and Settlement — apply structured negotiation techniques to
resolve outstanding commercial matters, substantiate positions, document
agreements, and achieve auditable settlement.
5. Release
of Retention, Bonds, Guarantees, and Securities — monitor contractual
completion requirements and prepare appropriate commercial closeout
documentation for release and final certification.
6. Defects,
Warranties, Completion, and Commercial Closeout — coordinate defects-liability
obligations, warranty information, completion documentation, outstanding works,
and financial closeout requirements.
7. Final
Cost Reporting and Lessons Learned — prepare final cost reports comparing
original budget, contract award, approved changes, actual cost, final account,
forecast accuracy, and major commercial lessons.
8. Executive
Quantity Surveying Reports and Dashboards — communicate complex commercial
information through concise management reports, dashboards, variance analysis,
risk summaries, recommendations, and decision papers.
9. Integrated
Case Study: End-to-End Advanced Quantity Surveying Management — manage a
simulated project from measurement and tendering through valuations,
variations, claims, cost forecasting, final account, and commercial closeout
using integrated project information.
10. Capstone
Exercise: Advanced Quantity Surveying Commercial Assessment — complete and
present a comprehensive quantity surveying portfolio incorporating advanced
measurement, BOQ preparation, estimating, tender evaluation, valuation, variation
assessment, cost reporting, risk analysis, digital tools, lifecycle costing,
final-account reconciliation, and strategic commercial recommendations.


